13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Stockpiles will be maintained and contained appropriately, which could include coveringor regular watering to minimise dust.• Minimal work will be undertaken during high wind periods.• Trucks and train carriages transporting spoil and other waste materials from site will becovered appropriately.• Disturbed areas will be rehabilitated after construction.Biodiversity• No trees will be removed.• Care will be taken to avoid damage to the existing trees and tree roots.• Care will be taken to minimise the spread <strong>of</strong> weeds. Appropriate management anddisposal <strong>of</strong> any noxious weeds, will be undertaken in consultation with Wollongong CityCouncil.• The work site will be inspected <strong>for</strong> any trapped or injured fauna at the start <strong>of</strong> each day.• Trenches/excavations will be covered at the end <strong>of</strong> each day and inspected be<strong>for</strong>e theyare backfilled to ensure that no fauna species are harmed.Noise and VibrationPlease refer to Table 2 Possible Construction Noise Control Measures.Heritage• If a non-Aboriginal historical relic is discovered, all work likely to affect it will cease andthe Project Manager will be contacted. RailCorp heritage staff and the Heritage Branch(<strong>for</strong>merly Heritage Office), Office <strong>of</strong> Environment and Heritage (OEH) will be notified asrequired. An investigation will be undertaken by a suitably qualified archaeologist toidentify suitable measures to reduce the impact on the relic discovered be<strong>for</strong>e workresumes.• Should Aboriginal heritage items be uncovered, all work in the vicinity will cease and theProject Manager and RailCorp heritage staff will be notified immediately. The Manager <strong>of</strong>the Planning and Aboriginal Heritage Section, Metropolitan Branch, EnvironmentProtection and Regulation Division, OEH will be notified in accordance with Section 89A<strong>of</strong> the National Parks and Wildlife Act 1974. The Local Aboriginal Land Council will benotified and an assessment by an archaeologist will be arranged to determine thePage 52 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!