13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Power CabinetThe power cabinet will be placed on a precast concrete slab adjacent to the BTS cabinet (described above) andwill be oriented to the north-west. The cabinet will be aluminium and be approximately 1700 millimetres high by1000 millimetres long by 880 millimetres wide. It will be placed on a steel plinth with a minimum height <strong>of</strong> 200millimetres to allow <strong>for</strong> the management <strong>of</strong> cables entering the cabinet. The power supply will enter the cabinetvia conduit located at the rear <strong>of</strong> the cabinet.The power cabinet will consist <strong>of</strong> the following:• AC and earth terminations;• transfer switch (mains and generator positions);• surge protection;• general purpose outlet;• low voltage disconnect;• rectifier modules;• controller/supervisory module;• DC distribution rack; and• batteries (with the capability <strong>of</strong> providing a minimum <strong>of</strong> four hours back-up).MonopoleA 20 metre monopole will be erected approximately two metres to the east <strong>of</strong> the BTS and power cabinets in therail corridor 13 metres east <strong>of</strong> the track. The monopole will be constructed with a bored pile foundation. The polewill be hinged about 1200-1400 millimetres from the base to assist in the erection <strong>of</strong> the pole, but onceestablished, the hinge will be bolted in order to fix the monopole in place.Two Argus antennas will be mounted 19 metres above the ground with azimuths <strong>of</strong> 20° and 190°. The anten naswill be installed to have a zero degree tilt, but will be able to be remotely adjusted to different degrees <strong>of</strong> tilt,without the need to climb the monopole <strong>for</strong> such adjustments.3.1.3 Power SupplyThe power will be supplied from the existing street pole number 3A0168 on Montague Street, Fairy meadowwhich is approximately 70 meters from the proposed BTS site. A single phase aerial supply will be taken fromthis pole to a new pole, metering cabinet, 25 kVA isolation trans<strong>for</strong>mer all located in the vicinity <strong>of</strong> the monopole.Power wil be supplied to the power cabinet via a new buried cable placed in a conduit.3.1.4 Fibre OpticsThe nearest two designated Network Access Points (NAPs)/Communications Rooms are at 2ATJ0101 atSW79+290 which is 470 metres from the site. The second is at NAP 2ATJ0440 at SW80+250, which is 490metres away from the site. Both NAPs will be utilised at this site.Page 22 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!