13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PrincipalProposalreported to the Civil Aviation Safety AuthorityAustralia.(b) The telecommunications facility is not tocause adverse radio frequency interference withany airport, port or Commonwealth Defencenavigational or communications equipment,including the Morundah Communication Facility,Riverina.(c) The telecommunications facility and ancillaryfacilities are to be carried out in accordance withthe applicable specifications (if any) <strong>of</strong> themanufacturers <strong>for</strong> the installation <strong>of</strong> suchequipment.(d) The telecommunications facility is not to affectthe structural integrity <strong>of</strong> any building on which itis erected.(e) The telecommunications facility is to beerected wholly within the boundaries <strong>of</strong> aproperty where the landowner has agreed to thefacility being located on the land.(f) The carrying out <strong>of</strong> construction <strong>of</strong> thetelecommunications facilities must be inaccordance with all relevant regulations <strong>of</strong> theBlue Book – ‘Managing Urban Storm water: Soilsand Construction’ (Landcom 2004), or itsreplacement.(g) Obstruction or risks to pedestrians or vehiclescaused by the location <strong>of</strong> the facility, constructionactivity or materials used in construction are to bemitigated.RailCorp will operate the radio facility with its ownspectrum and the facility will not cause anyinterference with other networks. All radiotransmitters will use the frequency assigned toRailCorp <strong>for</strong> the exclusive use <strong>of</strong> RailCorp.The installation and operation <strong>of</strong> the radioequipment and antennas will be carried out inaccordance with the manufacturers’specifications.The proposed facility will not be connected to anexisting building.The proposed facility will be inside the railcorridor that is owned and used by RailCorp.RailCorp is the proponent <strong>of</strong> the network andagrees to the use <strong>of</strong> the land <strong>for</strong> the proposedradio equipment.The activities associated with construction andinstallation will be done in accordance withsediment controls, erosion controls, stormwatercontrols and other controls outlined in the BlueBook (refer Section 4.1).Construction activities will take place in the railcorridor and changes to traffic and access are notexpected.Any traffic changes will be implemented inaccordance with an approved TrafficManagement PlanThere will be no risks to traffic or pedestriansduring the operation <strong>of</strong> the proposal.Page 62 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!