13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Executive SummaryNeed <strong>for</strong> the ProposalRailCorp currently operates an analogue train radio system known as MetroNet <strong>for</strong> operational communicationsbetween signallers and train drivers. This system has reached the end <strong>of</strong> its serviceable life and requiresreplacement. The New South Wales Government and RailCorp have begun work on the implementation <strong>of</strong> aDigital Train Radio System (DTRS) which will replace this analogue system and address a number <strong>of</strong>recommendations from the Waterfall Special Commission <strong>of</strong> Inquiry (WSCOI). The DTRS will be a secure digitaltrain radio system designed to provide reliable voice and data communications on a Global Systems Mobile –Railway (GSM-R) plat<strong>for</strong>m.The DTRS will provide 100% radio coverage <strong>for</strong> approximately 1,455 kilometres <strong>of</strong> RailCorp’s electrifiednetwork as well as more than 60 tunnels covering approximately 70 kilometres and has an expected design life<strong>of</strong> at least 15 years. UGL Infrastructure has been contracted to design, construct, commission and maintain theDTRS.Proposal DescriptionThe Fairy Meadow base transceiver station (BTS) will be installed in a cleared, grassy area on land with a slightslope about 13 metres east <strong>of</strong> the track on the South Coast Line. Fairy Meadow railway station is about 260metres north-northeast <strong>of</strong> the proposed site.The proposed work will involve the elements listed below.• A new 20 metre tall steel monopole with a 1500 millimetre high lighting rod at the top.• Two Argus panel antennas situated at a height <strong>of</strong> 19 metres.• One aboveground BTS cabinet and one power cabinet, which will be installed on a concrete slab, adjacentto the monopole.• A new power supply including a new power pole, metering cabinet, 25 KVA isolation trans<strong>for</strong>mer andnecessary connections.• Fibre connection into the existing RailCorp pit, including a new ULX.• Other associated and necessary activities to ensure the proper functioning <strong>of</strong> the radio communicationsfacility including earthing, safe access, signage and bollards <strong>for</strong> vehicle protection.Page 4 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!