13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

significance <strong>of</strong> the objects and any other requirements be<strong>for</strong>e work resumes.Waste• All waste will be classified in accordance with the Waste Classification Guidelines(DECCW 2009) and transported to a place that can lawfully accept the waste.• Any material that may be classified as a hazardous waste will be dealt appropriatelyand in accordance with RailCorp procedures.• Packaging will be minimised, where possible and where the safety and delivery <strong>of</strong>services is not compromised.• Wherever possible, suitable excavated spoil will be reused on site <strong>for</strong> backfilling,landscaping and other purposes.• Any spoil or waste material tracked onto roads will be swept up immediately.• Adequate numbers <strong>of</strong> bins and waste containers will be placed at the site. The sitemanager will ensure bins are not overflowing and are appropriately covered.• Waste water generated by non-destructive excavation will be taken <strong>of</strong>f site <strong>for</strong>treatment and disposal.• All waste will be removed from the site when work is completed.Contaminated Land and Hazardous Materials• During excavation, site workers will look <strong>for</strong> signs <strong>of</strong> potential contamination such asthe presence <strong>of</strong> waste and/or other imported materials, odours, soil colouring,floating layers in groundwater etc.• If any contamination is encountered or suspected, work will stop immediately and thesite will be fenced <strong>of</strong>f.• Any potential contamination will be investigated and work resumed only whenapproved by the Site Manager• A remedial action plan (RAP) will be prepared be<strong>for</strong>e clean up operations begin.• The site will be validated be<strong>for</strong>e work begins.• Contaminated soil will be segregated in a special container be<strong>for</strong>e classification anddisposal.• A hazardous materials management plan will be prepared if any hazardous materialsPage 53 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!