13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Two new 12 core single mode optical fibres (SMOF) will be run in two new separate conduits within a singletrench from the BTS cabinet to a new pit at SW79+774 in the down cess, approximate trenching distance is 17metres, from this point the two fibres will run through a new underline crossing to existing pit 2ATP04281 atSW79+774 in the up cess, at this point the two 12 core SMOF will take diverse routes to connect to theRailCorp Bearer Network. From pit 2ATP04281 fibre 2ATSXXXA will be routed through an existing RailCorpdirectional bore and pit and pipe route to NAP 2ATJ0101 where the fibre will be spliced to the RailCorp BearerNetwork. From pit 2ATP04281 fibre 2ATSXXXB will be routed through an existing RailCorp pit and pipe anddirectional bore to NAP 2ATJ0440 where the fibre will be spliced to the RailCorp Bearer Network. Fibreconnections are to be carried out by RailCorp.3.1.5 EarthingThe earthing installation will comprise six earth stakes at a pre determined distance apart. The grid will benominally 4.0 metres x 2 metres, placing the 6 earth stakes 2.0 metres apart. Once these earth stakes havebeen installed, the system will be tested and modified if needed.The initial extent <strong>of</strong> the trenching <strong>for</strong> earthing grid will be around 20 metres. However, it can be extended if theresults show that the earthing arrangement is insufficient3.2 Construction MethodologyConstruction <strong>of</strong> the BTS facility will require the use <strong>of</strong> approximately 200 square metres <strong>of</strong> land within theeastern side <strong>of</strong> the Illawarra Relief track. This area will allow <strong>for</strong> the erection <strong>of</strong> the monopole, power pole andthe slab containing the BTS and power cabinets.The monopole foundation will require an excavation approximately five metres deep with a diameter <strong>of</strong> onemetre. Approximately 10 square metres <strong>of</strong> ground disturbance is expected as result <strong>of</strong> excavation <strong>for</strong> monopole,power pole and a concrete slab. This will result in approximately ten cubic metres <strong>of</strong> excavated material. Thesoil from these excavations will be stockpiled be<strong>for</strong>e being used <strong>for</strong> backfilling and/or disposed <strong>of</strong> site. Soil thatcannot be used <strong>for</strong> backfilling (including, paving, rocks, etc) will be placed into a skip bin and removed from siteat the completion <strong>of</strong> construction works.Installation <strong>of</strong> the earth grid as well as power and fibre optic cables will require excavation <strong>of</strong> trenchesapproximately 1000 millimetres maximum depth. A total length <strong>of</strong> trenches is estimated to be around 100metres. All trenching excavation will be backfilled be<strong>for</strong>e the end <strong>of</strong> shift. If not practicable, trenches will becovered during nightThe construction methodology <strong>of</strong> the facility will include elements outlined below.• Non-destructive excavation be<strong>for</strong>e construction to establish underground installations.• Site establishment.• Excavation <strong>of</strong> the foundation <strong>for</strong> the monopole using excavator, drills or auger.• Delivery and pouring <strong>of</strong> concrete on site <strong>for</strong> the monopole foundation.Page 23 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!