Annexure – 11Environmental Management Plant [During Construction Stage]:EMP FOR AIR ENVIRONMENTTo mitigate the impact of dust during the construction phase of the proposed project, thefollowing measures are recommended for implementation:A dust control plan; <strong>and</strong>Procedural changes to construction activities.Dust Control PlanThe below mentioned Table provides dust control plan, specific to construction activities.Fugitive DustDust Control ActionsSource CategoryEarth-moving = For any earth moving which is more than 30m from all property lines,conduct watering as necessary to prevent visible dust emissions fromexceeding 100m in length in any direction.Disturbed surface = Apply dust suppression in a sufficient quantity <strong>and</strong> frequency to maintain aareas(exceptstabilized surface;completed grading Areas, which cannot be stabilized, as evidenced by wind driven dust, mustareas)have an application of water at least twice per day to at least 80% of theun-stabilized area. Apply water to at least 80% of all inactive accessible disturbed surfaceareas on a daily basis when there is evidence of wind driven fugitive dust. Inactive disturbed surface areasDisturbed surface = Apply water to at least 80 percent of all inactive accessible disturbedareas (completedsurface areas on a daily basis when there is evidence of wind drivengrading areas)fugitive dust.Inactive disturbedsurface areas= Apply dust suppressants in sufficient quantity <strong>and</strong> frequency to maintain astabilized surface; OR Utilize any combination of control actions 2c, 2d, or 3a such that, in total,they apply to all inactive disturbed surface areas.Unpaved roads = 4a. Water all roads used for any vehicular traffic at least twice per day ofactive operations; OR Water all roads used for any vehicular traffic once daily <strong>and</strong> restrict vehiclespeed to 15 mph.Open storage piles Apply water to at least 80 percent of the surface areas of all open storagepiles on a daily basis when there is evidence of wind driven fugitive dust.Track-out control Downwash of trucks (especially tyres) prior to departure from site.The most cost-effective dust suppressant is water, because a source of water tends to bereadily available on a construction site. Water can be applied using water trucks,h<strong>and</strong>held sprays <strong>and</strong> automatic sprinkler systems. Furthermore, incoming loads could becovered to avoid loss of material in transport, especially if material is transported offsite.Procedural Changes to Construction ActivitiesMaterial Production: The transport of materials such as concrete <strong>and</strong> asphalt toconstruction sites generate significant amounts of road dust, especially for sites that arerelatively far from material manufacturers. Setting up temporary portable concreteplants <strong>and</strong>/or asphalt plants at construction sites can eliminate haulage of materials.Phone No.: 0788 2294712, 2292683, Fax No.: 0788 2292241Web: www.ch<strong>and</strong>ulalch<strong>and</strong>rakarhospitalbhilai.comEmail: admin_ccmh@sify.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!