21.07.2015 Views

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Clarification – 12Our reply= Details of energy conservation techniques proposed.Details of energy efficient construction materials to beused to achieve the desired thermal comfort.= Only IS approved building material will be used forconstruction <strong>and</strong> will be procured from approved agencies.The major material required for construction of the proposedproject will be steel, cement, brick, flooring tiles/stones,sanitary <strong>and</strong> hardware items etc.Further energy conservation measures will be exercised bygood orientation of buildings, tree plantation, etc. byadopting the following measures:Adequate design to limit the losses in transmission <strong>and</strong>distribution system.Use of energy efficient devices like light sources such astrue-light fluorescent lamps <strong>and</strong> compact fluorescentlamps [CFLs].Use of insulation on roof top to reduce air-conditioningload.Use of capacitors at load centers to improve voltage <strong>and</strong>power factor to reduce distributional losses <strong>and</strong> also toavoid penalty by state electricity authority.All high efficiency motors will be used in the <strong>Hospital</strong>complex.Variable Frequency Drives are proposed to installed forhydro-pneumatic system for water supply <strong>and</strong> Secondarychilled water pumps for air-conditioning.Clarification – 13Our replyClarification – 14Our reply= Whether rehabilitation or resettlement required? Ifyes, provide the details <strong>and</strong> R & R scheme to ensure areasonable compensation package to project affectedpersons to be adopted as per government policy.= No rehabilitation/ resettlement will be required for proposedproject= Information regarding compliance of the ‘Manual onNorms <strong>and</strong> St<strong>and</strong>ards for Environmental Clearance forLarge Construction Projects’ issued by Ministry ofEnvironment <strong>and</strong> Forests, Government of India.= Please refer Annexure – 12 for compliance on ‘Manual onNorms <strong>and</strong> St<strong>and</strong>ards for Environmental Clearance for LargeConstruction Projects’Clarification – 15 = Proposed EMP along with Action plan for thedevelopment of greenbelt.Our reply= Proposed Environmental Management Plant is enclosed asAnnexure – 13 for your kind consideration.Phone No.: 0788 2294712, 2292683, Fax No.: 0788 2292241Web: www.ch<strong>and</strong>ulalch<strong>and</strong>rakarhospitalbhilai.comEmail: admin_ccmh@sify.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!