21.07.2015 Views

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Shri Ch<strong>and</strong>ulal Ch<strong>and</strong>rakar Memorial <strong>Medical</strong> CollegeVillage: Kach<strong>and</strong>ur, Tehsil <strong>and</strong> District: DurgSr.No.Information/checklistconfirmation3.3 Affect the welfare of peoplee.g. by changing livingconditions?Yes/NoYesDetails thereof (with approximatequantities/ rates, wherever possible) withsource of information dataNot Applicable as the proposed project willcreate more employment opportunitiesduring the construction <strong>and</strong> operationalstage <strong>and</strong> thereby a substantialimprovement in the socio-economicstatus.3.4 Vulnerable groups of people No No such activity is envisaged.who could be affected bythe project e.g. hospitalpatients, children, theelderly etc.,3.5 Any other causes No Not Applicable4. Production of solid wastes during construction or operation ordecommissioning (MT/month)Sr.No.Information/checklistconfirmationYes/NoDetails thereof (with approximatequantities/ rates, wherever possible) withsource of information data4.1 Spoil, overburden or minewastes4.2 Municipal waste (domestic<strong>and</strong> or commercialwastes)YesYesThe dug soil during excavation will beused for filling of low-lying areas.Mainly domestic <strong>and</strong> bio medical waste will begenerated from the proposed activity.It is estimated that at about 1506.25 kg/ Dayof waste will be generated from the <strong>Medical</strong>College <strong>and</strong> <strong>Hospital</strong> Complex during itsoperational phase, which includes wastegenerated by the floating <strong>and</strong> workingpopulation, kitchen <strong>and</strong> other activities.Adequate number of collection bins, separatesfor bio degradable <strong>and</strong> non biodegradablewaste shall provided as per the MSW(Management & H<strong>and</strong>ling) Rule as amended.Waste form such bin will be collectedseparately on daily basis.All the collection bins shall be properlymaintained on regular basis. Arrangement willbe made for the providing garbage station ortransfer point from where all wastes willfurther goes to downstream consumers/disposal site.About 125 kg per day bio medical waste will begenerated from the hospital complex, on thebasis of generation of Bio <strong>Medical</strong> waste @ 250gm/day/bed, which will be collected <strong>and</strong> storedas per the guideline of Bio-medical wastes[Management <strong>and</strong> H<strong>and</strong>ling] rules <strong>and</strong> will begiven to Common Incinerator Site of E-TechPvt. Limited, Bhilai

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!