21.07.2015 Views

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Shri Ch<strong>and</strong>ulal Ch<strong>and</strong>rakar Memorial <strong>Medical</strong> CollegeVillage: Kach<strong>and</strong>ur, Tehsil <strong>and</strong> District: DurgSr.No.Information/ChecklistconfirmationYes/NoDetails thereof (with approximatequantities /rates, wherever possible) withsource of information datacovered trucks by road. The road iscapable of h<strong>and</strong>ling the additionalvehicular traffic.1.26 Long-term dismantling ordecommissioning orrestoration works?1.27 Ongoing activity duringdecommissioning whichcould have an impact on theenvironment?1.28 Influx of people to an areain either temporarily orpermanently?1.29 Introduction of alienspecies?NoNoYesNoNo such works are envisaged.No such works are envisagedDuring construction local people will beinvolved. During operational phase of theproposed project preference will be givento the local people for administrationpurpose.No such activity is envisaged1.30 Loss of native species <strong>org</strong>enetic diversity?No Loss of native species <strong>and</strong> geneticdiversity will not be affected.1.31 Any other actions? No Not applicableAs a part of greenbelt development plannative species that are suitable to that soilcondition will be developed in consultationwith DFO as per CPCB Guidelines.2. Use of Natural resources for construction or operation of the Project (such as l<strong>and</strong>,water, materials or energy, especially any resources which are non-renewable orin short supply):Sr.No.Information/checklistconfirmationYes/NoDetails thereof (with approximatequantities/ rates, wherever possible) withsource of information data2.1 L<strong>and</strong> especiallyundeveloped or agriculturall<strong>and</strong> (ha)YesTotal 25 acres of l<strong>and</strong> is acquired forconstruction of <strong>Medical</strong> <strong>college</strong> <strong>and</strong><strong>Hospital</strong> Complex, comprises of unirrigated<strong>and</strong> irrigated agriculture l<strong>and</strong>.L<strong>and</strong> use of the proposed site is convertedto Non Agriculture purpose.2.2 Water (expected source &competing users) unit: KLDYes During Construction Phase :It is envisages that about 10 m 3 / dayof water will be required duringconstruction phase of medical <strong>college</strong><strong>and</strong> <strong>Hospital</strong> complex. Operational Phase:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!