21.07.2015 Views

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

d. L<strong>and</strong> area statement with parking details:Pertaining to l<strong>and</strong> area statement; the below mentionedtable depict the l<strong>and</strong> area statement of the proposedproject:Sr. No. ParticularBuilt Up Area1. Total l<strong>and</strong> available 101171.41 m 22. Ground Coverage 19802.84 m 23. Total built-up Area 80306.36 m 24. Green area 19859.53 m 25. Internal Roads 27475.80 m 26. Parking area 24290.00 m 2Pertaining to parking details we hereby like to state thatParking provision has been made as per norms for front<strong>and</strong> side marginal open space for individual parking. Theparking requirement for various activities of the project iscalculated <strong>and</strong> shown in Annexure – 5 to this letter.e. Offset from Public Roads:The same will be in accordance with the norms.Clarification – 3Our reply= Details of water supply source, water consumptionwith water balance, permission for supply of waterfrom competent authority, effluent generation fromhospital/ <strong>college</strong>/hostel, treatment <strong>and</strong> reuse ofeffluent, fuel consumption (if any), type of fuel, airpollutants emission sources <strong>and</strong> emission controlsystem proposed, power supply source.= Details pertaining to water source, its expected consumption,water balance, effluent generation <strong>and</strong> its treatment, reuse oftreated effluent, sources of air pollution etc is give as below:a. Details of water supply source:The desired quantum of water during construction phase[20kl/ Day] <strong>and</strong> operational phase [460 kl/ Day] of theproposed project too will be drawn from ground watersources.b. water consumption with water balance:estimation of water consumption is given as below:i. During construction phaseIt is estimated that about 20 kl/ day of water will berequired for proposed project <strong>and</strong> the same will bedrawn from ground water sources.ii. During post implementation [operational] phase:It is estimated that fresh water will be required to thetune of 440 kl/ day during the post implementationPhone No.: 0788 2294712, 2292683, Fax No.: 0788 2292241Web: www.ch<strong>and</strong>ulalch<strong>and</strong>rakarhospitalbhilai.comEmail: admin_ccmh@sify.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!