21.07.2015 Views

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Requirement Quality of water – Thewater quality for drinkingpurposes shall meetst<strong>and</strong>ards defined by IS10500-1991 <strong>and</strong> waterquality for other usesshall meet CPCBst<strong>and</strong>ards. Fixtures – Low flow/ dualflushing devices should beused for water closets.L<strong>and</strong>scape water quality Quality of water – Qualityof water for gardeningshould meet qualityst<strong>and</strong>ards as per IS11624-1986Our compliance1. <strong>Hospital</strong> : 500 200 100.0 m 3 /day2. College : 1000 30 30.0 m 3 /day3. Hostel : 800 90 72.0 m 3 /day4. Staff [75 x 5] : 375 90 34.0 m 3 /day5. Visitor : 750 10 8.0 m 3 /day6. Total 244.0 m 3 /day.= Yes.= It is proposed to implement dual flushing closets.= STP will be constructed to treat effluent from proposedmedical collage <strong>and</strong> hospital complex. It will be designedto achieve treated effluent quality as per the norms.Wastewater = Separation of grey <strong>and</strong> = Dual plumbing lines will be layed.black water- Separation ofgrey <strong>and</strong> black watermust be done by the useof dual plumbing line forseparation of grey <strong>and</strong>black water. Treatment- The treatedwaste water shall meetwith CPCB st<strong>and</strong>ards fordischarge. The grey <strong>and</strong>= Installation of STP is proposed to treat effluent.Treated effluent will be completely recycled withinpremises only for flushing, horticulture <strong>and</strong> floor washingpurpose.black water must be pipedin separate line <strong>and</strong> theremust be 100 per centtreatment of grey water<strong>and</strong> re use for flushing,gardening etc.Rainwater harvesting = Storm /rain water control<strong>and</strong> re use is m<strong>and</strong>atory= Rain water harvesting will be implemented in consultationwith CGWB, Raipur.<strong>and</strong> the system must beas per Central GroundWater Board (CGWB) <strong>and</strong>Bureau of IndianSt<strong>and</strong>ards(BISst<strong>and</strong>ards) for reuse invarious applications.Managing Transport, Noise =Phone No.: 0788 2294712, 2292683, Fax No.: 0788 2292241Web: www.ch<strong>and</strong>ulalch<strong>and</strong>rakarhospitalbhilai.comEmail: admin_ccmh@sify.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!