21.07.2015 Views

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

[Medical college and Hospital] - Seiaacg.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annexure – 12Compliance on Manual for Large construction Project:RequirementOur complianceSustainable Site PlanningSite Selection L<strong>and</strong> Use = The acquired l<strong>and</strong> is diverted for non-agriculture purpose.[as per Annexure – 1] Ambient environment =quality- The projectdesign shall ensure thatthe occupants of siteswhere the environment isalready polluted aresafeguarded against theadversities.Preconstruction air, water<strong>and</strong> noise quality shall bemonitored <strong>and</strong> it shall beensured that the ambientenvironment quality isminimally impacted uponby the proposedconstruction. Thegoverning st<strong>and</strong>ards forair, water <strong>and</strong> noise areas below:Air quality st<strong>and</strong>ardsas per IS-5182,Drinking waterst<strong>and</strong>ards as per IS:10500-1991Construction waterst<strong>and</strong>ards as perCPWD SpecificationsAmbient noisest<strong>and</strong>ards as perCentral PollutionControl Board (CPCB) The proponent shall also =take suitable measures toensure improvement ofenvironmental quality (ifthe ambient st<strong>and</strong>ards arenot met) through suitablemitigation measures. Infrastructure- There =must be a justification<strong>and</strong> proof of theavailability of water,energy, waste disposal<strong>and</strong> transport network forPhone No.: 0788 2294712, 2292683, Fax No.: 0788 2292241Web: www.ch<strong>and</strong>ulalch<strong>and</strong>rakarhospitalbhilai.comEmail: admin_ccmh@sify.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!