Figure 22<br />
PDA Readiness Criteria Worksheet<br />
PDA name: Sunnyvale El Camino Real Version: Baseline<br />
#<br />
Readiness<br />
Criteria Category<br />
# Sub-Criterion Name<br />
Present (2012)<br />
PDA Development Readiness Scoring<br />
2020 2030 2040 Notes<br />
A<br />
PDA Housing<br />
Capacity<br />
Estimate<br />
1 Estimate of current local land use policy<br />
new housing capacity<br />
2,850<br />
City said current PDA has max capacity of 2850 more than existing;<br />
CD+A estimated ~2700 on 107 acres of opportunity sites; City<br />
estimated 912 new DUs in PDA in next 8 years<br />
2 Plan Bay Area new housing allocation<br />
4,412<br />
The increment of new housing allocated to the PDA in Plan Bay<br />
Area<br />
A-64<br />
3 Capacity surplus or (shortfall) (1,562)<br />
4 Estimated increased capacity through<br />
likely changes to land use policy,<br />
including any initiative-based density<br />
restrictions (percentage change to<br />
existing capacity) 0% 20% 40%<br />
Difference between estimated housing capacity (2012) and<br />
allocation<br />
City's "Horizon 2035" Advisory Committee thought PDA could add<br />
4000 units, similar to ABAG allocation. EPS assumes such rezoning<br />
may be pursued within next ~15 years.<br />
5 Estimated gross housing capacity<br />
at each period 2,850 3,420 3,990<br />
6<br />
Sum of Capacity Constraint<br />
Coefficients<br />
0.55 0.30 0.20<br />
Near-term constraints include lower-density zoning than required to<br />
meet PDA allocation, redevelopment of productive uses, and parcel<br />
sizes/configurations as well as slow overall growth in the City.<br />
Zoning changes and strong market may facilitate improvement in<br />
longer term, but physical constraints still present.<br />
7<br />
EPS estimate of housing production<br />
given constraints<br />
1,283 2,394 3,192<br />
Figure exceeds current planned capacity, but still short of allocation.<br />
8<br />
Primary issue is the significant shortfall of capacity compared to<br />
allocation.<br />
Percentage of PDA 2040 housing<br />
allocation accommodated<br />
29.1% 54.3% 72.3%<br />
Economic & Planning Systems, Inc. 3/26/2013 Page 1 of 4 P:\121000\121113MTC\Readiness_Assessment Process\PDA Readiness Assessment\DS_Readiness Assessment_032513