Draft
Strategy for a Sustainable Region Priority ... - One Bay Area
Strategy for a Sustainable Region Priority ... - One Bay Area
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Figure 28<br />
PDA Readiness Criteria Worksheet<br />
PDA name: North San Jose Version: Baseline<br />
#<br />
Readiness<br />
Criteria Category<br />
# Sub-Criterion Name<br />
Present (2012)<br />
PDA Development Readiness Scoring<br />
2020 2030 2040 Notes<br />
D<br />
Market and<br />
Investment<br />
Attractiveness<br />
1<br />
History of real estate investment in PDA<br />
and surrounding city<br />
2 Recent Local Development Activity<br />
0.80 0.60 0.40<br />
0.00 0.00 0.00<br />
Extensive development of MFR in recent years: City says over 90%<br />
of new units in last 10 years. Minimum standards are 55 DU/acre for<br />
200 acres, 90 DU/acre for 85 acres; projects so far have been<br />
averaging 75 DU/acre. MAJOR CONSTRAINT: Policy restricts<br />
Phase 1 growth to 8K DU's until 7M SF of industrial is developed,<br />
then same for Phases 2-4. City records show only 1.2M SF of nonresidential<br />
building permits issues 1999-2012.<br />
As of March, pipeline had 8,400 units with zoning approval, of which<br />
7,394 housing units recently opened or with permits right now,<br />
though BMR units are lagging behind. Phase 1 housing is almost<br />
fully entitled, but can't proceed beyond that until phase 1 industrial is<br />
complete. City estimates 2M SF of industrial development in the<br />
pipeline right now, but well behind the housing demand for now.<br />
A-84<br />
3 General Market Conditions<br />
0.00 0.00 0.00<br />
Strong residential market as evident in development activity.<br />
Accessible area in major employment center, with many good-paying<br />
jobs locally and in greater area.<br />
4 Financial Feasibility Constraint<br />
0.00 0.00 0.00<br />
Market activity indicates that housing is feasible on numerous sites<br />
that are underutilized. Eventual challenge to redevelop more<br />
productive uses.<br />
5 Parcel size and configuration<br />
0.00 0.00 0.00<br />
Generally large and well-configured for efficient development, but<br />
Rincon South area has some smaller parcels for smaller projects.<br />
6 Existence of major investment<br />
disincentives 0.00 0.00 0.00<br />
None.<br />
Economic & Planning Systems, Inc. 3/26/2013 Page 3 of 4 P:\121000\121113MTC\Readiness_Assessment Process\PDA Readiness Assessment\DS_Readiness Assessment_032513