Draft
Strategy for a Sustainable Region Priority ... - One Bay Area
Strategy for a Sustainable Region Priority ... - One Bay Area
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 25<br />
PDA Readiness Criteria Worksheet<br />
PDA name: San Francisco Downtown-Geary-Van Ness Version: Baseline<br />
#<br />
Readiness<br />
Criteria Category<br />
# Sub-Criterion Name<br />
Present (2012)<br />
PDA Development Readiness Scoring<br />
2020 2030 2040 Notes<br />
B<br />
Planning and<br />
Entitlement<br />
Criteria<br />
1 Displacement of existing stable<br />
residential neighborhoods<br />
0.05 0.05 0.05<br />
All of PDA is very urban, mixed-use, dynamic, and projected<br />
capacity reflects underutilized sites only, though some may be in<br />
residential use today. San Francisco has a history of requiring<br />
special assistance for displaced residents.<br />
2 Time required and difficulty in obtaining<br />
entitlement: institutional capacity and<br />
jurisdictional track record<br />
0.10 0.00 0.00<br />
2010 survey said Specific Plan, programmatic EIR, zoning code,<br />
General Plan amendments, and urban design guideline are all in<br />
place, with no other major documents/processes required. 2010<br />
survey said most vertical projects take 12-18 months to process if<br />
CEQA in place, but most major projects outside Western SOMA,<br />
Rincon Hill, and TCDP would require 24+ months.<br />
A-74<br />
C<br />
Community<br />
Support<br />
1 Elected official support for proposed<br />
PDA use types and densities during<br />
past 3 years<br />
0.00 0.00 0.00<br />
High-density TCDP was approved unanimously at the BOS, which is<br />
generally supportive of visions in the existing plans, but these don't<br />
add up to PDA projections.<br />
2 History of neighborhood opposition<br />
0.05 0.00 0.00<br />
By San Francisco standards, Downtown PDA has had relatively little<br />
opposition to development. However, San Francisco is regarded as<br />
politically challenging by many developers.<br />
Economic & Planning Systems, Inc. 3/26/2013 Page 2 of 4 P:\121000\121113MTC\Readiness_Assessment Process\PDA Readiness Assessment\DS_Readiness Assessment_032513