2. site analysis & existing conditions<br />

3. <strong>Lake</strong>, landform, & hydrology<br />

<strong>Lake</strong> <strong>Ellyn</strong> <strong>Park</strong> lies in the valley between <strong>Lake</strong> Road to<br />

the east, Glenbard West High School to the south, and a<br />

residential neighborhood to the west. The parkland slopes<br />

gently towards the lake from the east and the west. The<br />

Ruth Candy <strong>Park</strong>way and Sam Perry Preserve are lower<br />

than the lake elevation (approximately 703 el.).<br />

The 10-acre <strong>Lake</strong> <strong>Ellyn</strong> is a manmade lake that serves as<br />

a regional stormwater detention facility for a 614-acre<br />

watershed that includes a significant portion of the Village<br />

of Glen <strong>Ellyn</strong>. <strong>Lake</strong> <strong>Ellyn</strong> was historically spring-fed,<br />

although its hydrology was altered as part of the Village’s<br />

stormwater management system. There are two inflow<br />

points at the south end of the lake, and an outflow at the<br />

north. Events greater than an approximately XX-year<br />

event rise above the banks and begin to spill out into<br />

the lawn areas surrounding the lake. The 100-year storm<br />

event floods an area of approximately 20 acres, including<br />

Duchon Field and the boathouse.<br />

A Hydrologic and Hydraulic study of <strong>Lake</strong> <strong>Ellyn</strong> was<br />

prepared by RHMG Consulting Engineers for the Village<br />

of Glen <strong>Ellyn</strong> and was completed in April 2012. The<br />

drainage area and flood statistics above were taken from<br />

that study. The purpose of the study was to assess the<br />

capacity of the <strong>Lake</strong> and to identify alternatives to prevent<br />

the <strong>Lake</strong> from overtopping the dam during the 100-year<br />

<strong>Lake</strong> <strong>Ellyn</strong> <strong>Park</strong><br />

<strong>Lake</strong> <strong>Ellyn</strong> Watershed<br />

linden drainage area<br />

<strong>Lake</strong> <strong>Ellyn</strong><br />

lyn<br />

lake road drainage area<br />

main inlet drainage area<br />

Village of Glen <strong>Ellyn</strong><br />

<strong>Lake</strong> <strong>Ellyn</strong> watershed diagram<br />

18 Glen <strong>Ellyn</strong> <strong>Park</strong> District