Phasing priorities/master plan updates<br />
This master plan, the descriptions of various elements,<br />
and cost information are meant to facilitate the long-term<br />
renovation of the park through various methods and with<br />
a variety of resources. It is most likely that at least some<br />
of the improvements will be made to several areas at once,<br />
while others will be exclusive to a certain park area. Some<br />
items have been identified in the plan that will be done<br />
as part of normal or expanded park maintenance, such<br />
as turf repair/enhancement or clearing of invasive woody<br />
understory vegetation in natural areas. Other elements,<br />
such as the trail system, are in all of the areas, and could<br />
be done in one or several phases. Still other elements are<br />
individual features located in a particular area, such as the<br />
boathouse, or the playground. All of the improvements are<br />
contingent upon the adequate identification and allocation<br />
of funds to construct and maintain that particular element<br />
in the park long-term. Improvements and renovations will<br />
be prioritized based upon the following criteria:<br />
1. Condition, age, potential liability, and appearance<br />
2. Available funds for that particular item<br />
3. Relationship with other anticipated improvements,<br />
i.e. remote restroom in conjunction with boathouse<br />
renovations<br />
4. Uninterrupted use of the park facilities to the<br />
degree possible<br />
5. Collaboration/cooperation with the Village and the<br />
School District on improvements to adjacent sites,<br />
such as the upcoming reconstruction to Lenox<br />
Road and Essex Road<br />
6. Cost/pricing efficiencies<br />
Phases of park improvement will be structured to address<br />
these and other factors as they arise. This <strong>Master</strong> <strong>Plan</strong><br />
should be re-assessed and potentially updated or revised<br />
after each substantial capital phase, and/or every five<br />
years, whichever comes first.<br />