Lake Ellyn Park 2013 Master Plan
Lake Ellyn Master Plan Final - Glen Ellyn Park District
Lake Ellyn Master Plan Final - Glen Ellyn Park District
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3. the vision<br />
One proposed alteration is the restoration of the Boathouse<br />
west facade by removing the small West Addition,<br />
resurfacing the original limestone fireplace and restoring<br />
the original shape of the West facade. The trash and<br />
HVAC equipment is intended to be relocated away from<br />
the Boathouse to a new enclosure near the accessible parking.<br />
Where there is currently a blank west wall, a new West<br />
entrance is proposed to allow users from Lenox Avenue to<br />
be welcomed to the Boathouse facilities. The redesign will<br />
include a hallway with access to restrooms for Boathouse<br />
users. An additional Restroom Facility is proposed to be<br />
constructed for park users south of the Boathouse near<br />
the Playground Area allowing continued public access to<br />
restrooms during private events. Other exterior changes<br />
include restoring the roofing to with the original 1937<br />
‘precision’ wood shingle, and restoring the original paint<br />
color on all wood cladding and trim.<br />
Original Floor <strong>Plan</strong><br />
Entrance<br />
Hall<br />
Mechanical<br />
Women’s<br />
Restroom<br />
Storage<br />
Men’s<br />
Restroom<br />
Kitchen<br />
Main Hall<br />
Entrance<br />
New Floor <strong>Plan</strong><br />
1’ 4’ 8’<br />
N<br />
<strong>Lake</strong> <strong>Ellyn</strong> <strong>Park</strong> <strong>Master</strong> <strong>Plan</strong><br />
55