04.09.2015 Views

Lake Ellyn Park 2013 Master Plan

Lake Ellyn Master Plan Final - Glen Ellyn Park District

Lake Ellyn Master Plan Final - Glen Ellyn Park District

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. the vision<br />

Kitchen & South Patio<br />

The anticipated increase in use of the Boathouse will<br />

require a modernized and redefined Kitchen. Passage<br />

from the Main Hall to the new South Patio area will be<br />

accessed through hallways accessed on both the east and<br />

west of the new kitchen. Two doors, East and West of the<br />

current service counter window will create symmetrical<br />

access both to the trellis/ warming shelter to the east and<br />

the patio to the South. The existing Kitchen and storage<br />

spaces will be reconfigured to accommodate this new<br />

circulation and service capabilities.<br />

Warming Shelter<br />

The boathouse will continue to be used as a warming<br />

shelter for skaters during the winter. In order to make<br />

the boathouse usable as a private rental facility as well, the<br />

current rubber flooring will be replaced with a durable,<br />

easy-to-remove surface that could easily me moved for<br />

events. The boathouse will be rentable during specified<br />

times during the winter (Friday and Saturday evenings,<br />

for example).<br />

Entrance<br />

Hall<br />

Mechanical<br />

Existing view facing south<br />

Storage<br />

Women’s<br />

Restroom<br />

Men’s<br />

Restroom<br />

X<br />

Kitchen<br />

Main Hall<br />

Entrance<br />

1’ 4’ 8’<br />

N<br />

<strong>Lake</strong> <strong>Ellyn</strong> <strong>Park</strong> <strong>Master</strong> <strong>Plan</strong><br />

59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!