V. COST-EFFECTIVENESS AND COST-BENEFIT ANALYSIS MATHEMATICA POLICY RESEARCH<br />

Table V.2. Cost <strong>of</strong> the <strong>BRIGHT</strong> schools<br />

2006–2008<br />

(costs for 3<br />

classrooms)<br />

2009–2012<br />

(costs for 3<br />

additional<br />

classrooms)<br />

Life<br />

span<br />

A. School<br />

School $39,449 $45,209 40<br />

Teacher housing $41,868 $47,982 40<br />

Playground $135 $154 40<br />

Construction supervision $1,060 $1,215 40<br />

M & E coordination a $1,060 $1,215 40<br />

Five-year maintenance $1,463 $1,677 5<br />

Teacher salaries b $7,173 $20,593 1<br />

B. Other elements c<br />

Borehole and water pump $8,812 $10,099 40<br />

Bisongo $7,554 $8,657 40<br />

Base latrine $3,697 $4,237 40<br />

Separate girls latrine $3,697 $4,237 40<br />

Take-home rations $1,400 $1,604 1<br />

Note:<br />

Cost estimates for <strong>BRIGHT</strong> schools from 2006–2008 were obtained from the MCC directly in 2009 and are<br />

assumed to be the same in the next three years (2009–2011). Estimates for the 2006–2008 period are<br />

shown in 2006 U.S. dollars and for the 2009–2012 period are shown in 2009 U.S. dollars.<br />

a<br />

We have been unable to determine exactly what this cost entails. As a result, we have included it to be<br />

conservative. If it reflects the cost <strong>of</strong> participating in the impact evaluation conducted using the 2008 survey, it should<br />

not be included in these calculations. However, if it reflects the costs <strong>of</strong> participating in M & E activities typically<br />

conducted by the <strong>Burkina</strong>bé government (such as monitoring <strong>of</strong> the construction work), it should be included. In either<br />

case, this decision has little effect on the final cost estimates because the magnitude is very small relative to the<br />

overall cost <strong>of</strong> the schools.<br />

b<br />

Teacher salaries are calculated by multiplying the average annual salary <strong>of</strong> a teacher ($2,978) by the average<br />

number <strong>of</strong> teachers in the <strong>BRIGHT</strong> schools.<br />

c<br />

Maintenance for such elements as the latrine and borehole and water pump are included in the five-year<br />

maintenance costs in panel A.<br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!