PPP Business Plan 09 03
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
efurbishment project<br />
Intervention of redevelopment<br />
The construction of three luxury suites to be carried out with the highest standards. The design of the furniture is by<br />
Philippe Starck. These suites are to be equipped with fitness and wellness areas, as well as shared common areas with security<br />
facilities, an office and a movie-theatre.<br />
Garden Suite<br />
The Garden Suites is developed on three floors, featuring Sub 1, Sub 2 and Sub 3. The ground floor of the Garden Suite<br />
are going to became private gym and wellness directly connected with the apartment at the first floor of the Garden Suite,<br />
through a spiral staircase. Between the ground and the first, there is an intermediate/mezzanine floor.<br />
The charming private garden provides serenity, harmony and peace. Thanks to the floor to ceiling windows the spacious<br />
rooms of this apartment have an incredible amount of natural light. The antique hand painted wooden ceilings and the<br />
cozy fireplace can create the comforting atmosphere of a real home.<br />
The ground floor of the apartment sub.1 will be connected with sub.2 and that connected with sub.3:sub.2 and sub.3 are<br />
going to became private gym and wellness directly connected with the ‘’garden apartment ‘’<br />
Ambassador Suite and Executive Suite<br />
The Ambassador and the Executive Suites are located at the second/mezzanine floor of the Palazzetto, at the Sub 4 and<br />
Sub 5, respectively.<br />
The spiral staircase sub.6 will be connected (opening the old existing door) with sub.7 and that one with sub.8, opening a<br />
completely new door this time. In this way, the Ambassador and Executive Suites will have a big fitness and wellness area<br />
that can be stunning and fascinating because original frescos and ceiling with vaults. The same spiral staircase will also<br />
connect the two suites to a little chapel and the rooftop terrace, Sub. 6.<br />
Common Areas<br />
Common areas feature Sub 9, Sub 10 and Sub 11 respectively as a Management Office, the Private Entrance from p.za<br />
Capizucchi and the Theater; at the ground floor of the Palazzetto.<br />
The Office consists of a single room with a recently restored fresco at the center of the ceiling, it has travertine floors and<br />
its walls are equipped with a sink, now dismantle. It will be necessary to install the heating and air conditioning system.<br />
The Private Theater consists in a specious unit of three rooms and a bathroom. The floor of the ground floor is made of<br />
faux wood. The electrical, plumbing and heating systems have been recently renovated. Install a cutting-edge movie projector,<br />
a security system, refurbishment of the bathroom in the basement, and other adjustments.<br />
The Private Entrance consists of a central space connected to the services, which are doubled by means of a staircase and<br />
a loft of a second bathroom. The entrance from Capizucchi square allows using it independently from the entrance hall of<br />
the ‘Palazzo’ itself, becoming a private and securing entry. Needs to paint the premises.<br />
Conclusion<br />
Moreover, for all the premises, the implementation of security and home automation systems according to the latest technological<br />
standards all the area as well as the development of a sophisticated “landscape” and a botanical and architectural<br />
intervention at the garden of the first floor.<br />
Total amount: approximately EUR 2,000,000 with the ‘turn-key’ formula.<br />
-108 -