09.03.2017 Views

PPP Business Plan 09 03

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

efurbishment project<br />

Art.<br />

11<br />

Description<br />

Entrance<br />

Room<br />

U.m.<br />

Quant.<br />

Price<br />

Tot.Partial.Euro<br />

Tot.Gen.Euro<br />

11.1<br />

Tempera painted ceilings and<br />

veils including its preparation,<br />

by shaving and primer : for<br />

three hands to cover.<br />

Entire room<br />

sqm<br />

114<br />

18<br />

2.052<br />

11.2<br />

Painting with water-based paint<br />

for three hands to cover the<br />

walls of existing and th new,<br />

including grouting, shooting<br />

sharp , shaving and preparation.<br />

Entire room<br />

sqm<br />

300<br />

20<br />

6.000<br />

Total Entrance<br />

8.052<br />

12<br />

Others<br />

12.1<br />

Supply of a new elevator with a<br />

modern glass transparent door.<br />

a c.<br />

55.000<br />

55.000<br />

12.2<br />

Implementation of security<br />

systems and home automation<br />

according to the most advanced<br />

technological standards.<br />

Entire building<br />

80.000<br />

80.000<br />

N.B.<br />

Further investigation is needed to verify more accurately some of the mentioned items.<br />

- 117 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!