09.03.2017 Views

PPP Business Plan 09 03

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

appraisal<br />

However, the real architectural distortion in that area was due to the opening of the Via dei Fori<br />

Imperiali - in the beginning called Via dell’Impero - according to the fascist project of modernizing<br />

monuments and celebrations. It was inaugurated in 1932 by erasing entire historic streets, demolishing<br />

church buildings, gutting hills and pulling down old structures and statues of the Roman<br />

republican and imperial age. So what was built in the early days of the city, and what was designed<br />

and built in recent times, coexist in Campitelli more than in any other location in Rome. It took ten<br />

months’ work to change all of the features of the area: the new large gap emerged between Piazza<br />

Venezia and the Colosseum – beyond any possible ideological consideration – presented itself<br />

from the start, on the aesthetic, functional, urban levels, as the most visible symbol of the eternal<br />

conflict that seems to caress the soul of those who live or pass through the walls of the City. That<br />

intermittent and arcane dilemma, which is ultimately impossible to solve, inextricable, and for this<br />

reason darkly fascinating; that doubtful hesitation between the admiration of the ancient and the<br />

need for modernization – that dilemma lingers and spreads in Rome in a unique way within the<br />

whole world. And that is not a limit, but rather a continuous source of new vitality – like the needle<br />

of an imaginary compass of time, vibrating between the remains of the early days, the recent<br />

echoes of the day before yesterday, and the deafening calls of today.<br />

8 – SUMMARY OF SURFACES IN SQUARE METERS<br />

VALUABLE COMMERCIAL SURFACE SUITES 1221,32<br />

COMMERCIAL STORAGE SURFACE 24<br />

SURFACE OF GARDENS 177,65<br />

SURFACE OF ROOFTOP & TERRACES WITH VIEW 259,19<br />

SURFACE OF SUITE'S EXTERNAL UNITS 124<br />

CAR PARKING AREAS AT THE ENTRANCE HALL OF THE ‘PALAZZO’ 4<br />

9 - A SEARCH FOR THE EVALUATION CRITERIA<br />

According to a general definition, “evaluation is the discipline that aims to provide the methodological<br />

tools for the assessment of those assets that can not be assessed in an unambiguous fashion”<br />

(“Estimo. Teoria, procedure di valutazione e casi applicativi” / “Appraisal. Theory, assessment and<br />

case studies”, Grillenzoni Maurizio, Grittani Giovanni – Calderini – 1994).<br />

For the proper preparation of an estimate, it is necessary to establish, in the first place, the principle<br />

of ‘objective assessment’ whose absence will inevitably make the estimate depart from market<br />

realities – which, in fact, is a substantial and determining feature when seeking to ascertain a<br />

value.<br />

In the present case, the purpose of the estimative report is to identify “the most probable maximum<br />

market value” to be allocated to the building, taking into consideration the optimum conditions resulting<br />

from a radical functional redevelopment as described in the previous chapter.<br />

Having said that, we have been focusing - as per our mandate - on establishing the Market Value<br />

applying the processes of direct and indirect estimates.<br />

-90 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!