13.04.2018 Views

CAPITOL TECHNICAL MANUAL

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FRAMED SHUTTER INSTALLATION<br />

1. Frames will be labelled as left (L), top (T), right (R) and bottom (B).<br />

2. Lay the frames face up on your protected workspace, following labels clockwise.<br />

3. Mitres on frame corners are joined using a nylon key (Hoffman Key) for OPUS, and metal<br />

brackets for ENCORE to hold the frame together to maintain squareness. Push each<br />

frame piece together halfway on each key until mitres are neat then push until the<br />

Hoffman keys are flush with back of frames, or push frames together on metal brackets<br />

for ENCORE.<br />

OPUS FRAME MITRES<br />

The maximum frame or board length supplied is 3657mm. Anything over this size will be<br />

supplied with Hoffman Keys, dowels or brackets to join lengths together onsite.<br />

ENCORE FRAME MITRES<br />

56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!