Additionally, our associated company, WAIL, has a 100.0% shareholding interest in Otto 1 Ltd., which in<br />
turn owns Otto 1, a work barge with accommodation for 300 people which is chartered to third parties. See<br />
“— Our Operations — Ship Chartering”.<br />
Capacity and Utilisation Rates of Our Shipyard<br />
We own and operate our shipyard through our subsidiaries, PT Lestari and PT Batamec. Our yard<br />
presently operates on one eight-hour shift per day, six days a week. We have not experienced any material<br />
production interruption, whether due to labour disputes, power interruptions, fire or other causes.<br />
The docking facilities in our shipyard consist of a Syncrolift» and graving dock. The table below<br />
summarises the annual production capacity of our yard for each of the last three financial years:<br />
Berth<br />
Days<br />
FY2005 FY2006 FY2007<br />
%of<br />
Capacity (1)<br />
Berth<br />
Days<br />
%of<br />
Capacity (1)<br />
Berth<br />
Days<br />
%of<br />
Capacity (1)<br />
Syncrolift»<br />
Berthing area A<br />
(seven berths)<br />
Maximum capacity ...................... 2520 2520 2520<br />
Occupied berth days ..................... 2074 82% 2097 83% 1323 53%<br />
Maintenance period ..................... 149 6% 101 4% 135 5%<br />
Vacant days ........................... 297 12% 322 13% 1062 (2)<br />
42%<br />
Berthing area B<br />
(four berths, increased to six berths since<br />
September 2007)<br />
Maximum capacity ...................... 1440 1440 1668 (3)<br />
Occupied berth days ..................... 1176 82% 826 57% 1600 96%<br />
Maintenance period ..................... 53 4% 193 14% 48 3%<br />
Vacant days ........................... 211 14% 421 29% 20 1%<br />
Graving Dock<br />
Maximum capacity ...................... 365 365 365<br />
Occupied berth days ..................... 345 94% 352 96% 347 95%<br />
Maintenance period ..................... 13 4% 9 3% 14 4%<br />
Vacant days ........................... 7 2% 4 1% 4 1%<br />
Notes:<br />
(1) Our maximum capacity for each berthing area is calculated based on the total number of berth days available<br />
in respect of all of the berths in that particular berthing area for each financial year, where one berth<br />
day represents one vessel being berthed in a particular berth for one day. In relation to the berthing areas,<br />
the number of berth days available for each financial year is 360 days and in relation to the graving dock,<br />
the number of available days for each financial year is 365 days. Our production capacity utilisation rate<br />
for each berthing area is calculated by having the total number of occupied berth days divided by the maximum<br />
capacity for that berth.<br />
(2) Berthing area A was vacant for 820 berth days for upgrading works.<br />
(3) The increase in maximum capacity is as a result of increase in the number of berths within berthing<br />
area B.<br />
In the shipyard industry, the utilisation rate of a yard is generally not a meaningful indicator of<br />
performance. This is primarily because the capacity of a shipyard varies according to many factors, including<br />
the availability of raw materials, equipment and other supplies, the type and size of vessels berthed in the yard<br />
and the type of work being undertaken. In order to minimise these variables as far as possible, we have<br />
measured the utilisation rates of our shipyard in terms of the proportion of the total number of available berth<br />
days in the yard. The number of berth days may fluctuate depending on the type of vessel we produce and our<br />
product mix changes. In addition, it is possible for us to alter the working hours of our production by<br />
subcontracting some of the assembly work to external subcontractors and thereby influencing the capacity and<br />
utilisation rates of our facilities.<br />
116