22.12.2012 Views

O TTO M ARINE L IMITED - Microsoft Internet Explorer - SGX

O TTO M ARINE L IMITED - Microsoft Internet Explorer - SGX

O TTO M ARINE L IMITED - Microsoft Internet Explorer - SGX

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Additionally, our associated company, WAIL, has a 100.0% shareholding interest in Otto 1 Ltd., which in<br />

turn owns Otto 1, a work barge with accommodation for 300 people which is chartered to third parties. See<br />

“— Our Operations — Ship Chartering”.<br />

Capacity and Utilisation Rates of Our Shipyard<br />

We own and operate our shipyard through our subsidiaries, PT Lestari and PT Batamec. Our yard<br />

presently operates on one eight-hour shift per day, six days a week. We have not experienced any material<br />

production interruption, whether due to labour disputes, power interruptions, fire or other causes.<br />

The docking facilities in our shipyard consist of a Syncrolift» and graving dock. The table below<br />

summarises the annual production capacity of our yard for each of the last three financial years:<br />

Berth<br />

Days<br />

FY2005 FY2006 FY2007<br />

%of<br />

Capacity (1)<br />

Berth<br />

Days<br />

%of<br />

Capacity (1)<br />

Berth<br />

Days<br />

%of<br />

Capacity (1)<br />

Syncrolift»<br />

Berthing area A<br />

(seven berths)<br />

Maximum capacity ...................... 2520 2520 2520<br />

Occupied berth days ..................... 2074 82% 2097 83% 1323 53%<br />

Maintenance period ..................... 149 6% 101 4% 135 5%<br />

Vacant days ........................... 297 12% 322 13% 1062 (2)<br />

42%<br />

Berthing area B<br />

(four berths, increased to six berths since<br />

September 2007)<br />

Maximum capacity ...................... 1440 1440 1668 (3)<br />

Occupied berth days ..................... 1176 82% 826 57% 1600 96%<br />

Maintenance period ..................... 53 4% 193 14% 48 3%<br />

Vacant days ........................... 211 14% 421 29% 20 1%<br />

Graving Dock<br />

Maximum capacity ...................... 365 365 365<br />

Occupied berth days ..................... 345 94% 352 96% 347 95%<br />

Maintenance period ..................... 13 4% 9 3% 14 4%<br />

Vacant days ........................... 7 2% 4 1% 4 1%<br />

Notes:<br />

(1) Our maximum capacity for each berthing area is calculated based on the total number of berth days available<br />

in respect of all of the berths in that particular berthing area for each financial year, where one berth<br />

day represents one vessel being berthed in a particular berth for one day. In relation to the berthing areas,<br />

the number of berth days available for each financial year is 360 days and in relation to the graving dock,<br />

the number of available days for each financial year is 365 days. Our production capacity utilisation rate<br />

for each berthing area is calculated by having the total number of occupied berth days divided by the maximum<br />

capacity for that berth.<br />

(2) Berthing area A was vacant for 820 berth days for upgrading works.<br />

(3) The increase in maximum capacity is as a result of increase in the number of berths within berthing<br />

area B.<br />

In the shipyard industry, the utilisation rate of a yard is generally not a meaningful indicator of<br />

performance. This is primarily because the capacity of a shipyard varies according to many factors, including<br />

the availability of raw materials, equipment and other supplies, the type and size of vessels berthed in the yard<br />

and the type of work being undertaken. In order to minimise these variables as far as possible, we have<br />

measured the utilisation rates of our shipyard in terms of the proportion of the total number of available berth<br />

days in the yard. The number of berth days may fluctuate depending on the type of vessel we produce and our<br />

product mix changes. In addition, it is possible for us to alter the working hours of our production by<br />

subcontracting some of the assembly work to external subcontractors and thereby influencing the capacity and<br />

utilisation rates of our facilities.<br />

116

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!