U6509-3104 ABM Fire Fighting Package Tender ... - Bharat Petroleum
U6509-3104 ABM Fire Fighting Package Tender ... - Bharat Petroleum
U6509-3104 ABM Fire Fighting Package Tender ... - Bharat Petroleum
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BHARAT PETROLEUM CORPORATION LTD Special Conditions of Contract<br />
CCR PROJECT , MAHUAL REFINERY- MUMBAI<br />
1.0 DEFINITIONS<br />
2.0 GENERAL<br />
Sheet 3 of 29<br />
“Consultant” shall mean Uhde India Private Ltd., (UIPL) having their office at Dugal plaza, Prem<br />
Nagar, Bibwewadi Road, Pune – 411037 , India.<br />
Engineer- in Charge shall mean Resident Construction Manager ( RCM) designated by<br />
UIPL.<br />
a) These Special Conditions of Contract (SCC) shall be read in conjunction with the General<br />
Conditions of Contract (GCC), Schedule of Rates, specifications of work, drawings and any other<br />
document forming part of this Contract wherever the context so requires.<br />
b) Notwithstanding the sub-division of the document into these separate sections and volumes, every<br />
part of each shall be deemed to be supplementary of every other part and shall be read with and<br />
into the Contract so far as it may be practicable to do so.<br />
c) If any provision in the General Conditions of Contract is repugnant to or at variance with any<br />
provision (s) of the Special Conditions of Contract and / or the Agreed Variations or if any provision<br />
of the Special Conditions of Contract is repugnant to or at variance with any provision (s) of the<br />
Agreed Variations, and the two cannot be reconciled or otherwise co-exist, then unless a different<br />
intention appears, the provision (s) of the Special Conditions of Contract shall be deemed to override<br />
the provision (s) of General Conditions of Contract and the provision (s) of the Agreed Variations<br />
shall be deemed to override the provision (s) of the Special Conditions of Contract, but only to the<br />
extent that such repugnancies in the General Conditions of Contract cannot be reconciled with the<br />
Special Conditions of Contract and / or Agreed Variations or to the extent that such repugnancies in<br />
the Special Conditions of Contract cannot be reconciled with the Agreed Variations, as the case may<br />
be.<br />
d) It will be the CONTRACTOR’s responsibility to bring to the notice of Engineer-in-Charge any<br />
irreconcilable conflict in the Contract documents before starting the work (s) or making the supply<br />
with reference to which the conflict exists.<br />
e) Wherever it is stated in this Bidding Document that such and such a supply is to be effected or such<br />
and such a work is to be carried out, it shall be understood that the same shall be effected/carried out<br />
by the CONTRACTOR at his own cost, unless a different intention is specifically and expressly stated<br />
herein or otherwise explicit from the context. Contract value (also referred to as Contract Price) shall<br />
be deemed to have included such cost.<br />
f) The materials, design and workmanship shall satisfy the applicable relevant Indian Standards,<br />
the job specifications contained herein & codes referred to. Where the job specifications<br />
stipulate requirements in addition to those contained in the standard codes and specifications,<br />
these additional requirements shall also be satisfied. In the absence of any Standard /<br />
Specifications/Codes of practice for detailed specifications covering any part of the work<br />
covered in this Bidding Document, the instructions/directions of Engineer-in-Charge will be<br />
binding on the CONTRACTOR.<br />
g) In the absence of any Specifications covering any material, design or work(s) the same shall be<br />
performed/ supplied/ executed in accordance with standard Engineering practice as per the<br />
instructions/directions of the Engineer-in-Charge, which will be binding on the CONTRACTOR.<br />
3.0 WATER AND POWER<br />
a) The clause No. 2.3 and 2.4 in Section – II (General Information about Site) of General Condition of<br />
Contract – BPCL – Refinery Division – Mahul, Mumbai regarding Water, Power and other facilities is<br />
modified to following extent:<br />
b) Water shall be provided to the CONTRACTOR at one point, subject to availability, on<br />
chargeable basis. The CONTRACTOR shall at his own cost arrange for tapping, storage tank &