BHARAT PETROLEUM CORPORATION LTD Special Conditions of Contract<br />

CCR PROJECT , MAHUAL REFINERY- MUMBAI<br />

Sheet 16 of 29<br />

bidding purpose only. Purpose of these drawings is to enable the bidder to make an offer in line with<br />

the requirements of the OWNER. However, no extra claim whatsoever, shall be entertained for<br />

variation in the “Approved for Construction” and “Bid Drawings” regarding any changes of work.<br />

Construction shall be as per drawings / specifications issued / approved during the course of<br />

execution of work.<br />

b) The drawings and documents to be submitted by the CONTRACTOR to OWNER / UIPL after award<br />

of the work as per the requirements enlisted in the bidding document elsewhere shall be for<br />

OWNER / UIPL’s review, information and record. The CONTRACTOR shall ensure that drawings<br />

and documents submitted to OWNER / UIPL are accompanied by relevant calculations, data as<br />

required and essential for review of the document / drawings by OWNER / UIPL.<br />

c) All documents and drawings including those of CONTRACTORs sub-vendor’s manufacturer’s etc.<br />

shall be submitted to OWNER / UIPL after having been fully vetted in detail, approved and corrected<br />

by the CONTRACTOR & shall bear CONTRACTORs seal / certifications to this effect. All<br />

documents / drawings & submissions made to OWNER / UIPL without compliance to this<br />

requirement will not be acceptable and the delay & liability owing to this shall be to the<br />

CONTRACTOR’s account.<br />

d) The review of documents and drawings by OWNER / UIPL shall not be construed by<br />

CONTRACTOR as limiting any of his responsibility to meet the requirements of specifications,<br />

drawings etc. and liabilities for mistakes and deviations. Upon receiving the comments on the<br />

drawing / documents reviewed by OWNER / UIPL, CONTRACTOR shall incorporate the comments<br />

as required and ensure their compliance. The subsequent submission by the CONTRACTOR of the<br />

updated drawings / documents shall be accompanied by a compliance report etc. The submissions<br />

calling for repeated reviews by the OWNER / UIPL shall be avoided by the CONTRACTOR.<br />

e) Any inaccuracies, errors and non-compliance to contractual requirements will be rectified by the<br />

CONTRACTOR. Delay occurring on this shall be to the account of the CONTRACTOR.<br />

41.0 ELECTRICAL CONTRACTOR’S LICENCE<br />

a) The CONTRACTOR or its nominated Sub-CONTRACTOR (s), as the case may be, shall have a<br />

valid electrical CONTRACTOR’s license for working in the State in which the job site is located. The<br />

CONTRACTOR shall furnish a copy of the same to Engineer-in-charge before commencement of<br />

any electrical work or work pertaining to Electrical System.<br />

b) No Electrical work or work pertaining to electrical system (s) shall be permitted to be executed<br />

without a valid Electrical CONTRACTORs License being produced by the CONTRACTOR or Sub-<br />

CONTRACTOR, as the case may be, intending to execute the work.<br />

42.0 CONTRACTOR’S COMPUTERISED BILLING SYSTEM<br />

Without prejudice to the stipulation in General Conditions of Contract, CONTRACTOR should<br />

follow the following billing system:<br />

The bills will be prepared by the CONTRACTOR on their own PCs as per the standard formats<br />

and codification scheme proposed by BPCL. CONTRACTOR will submit these data to BPCL /<br />

UIPL in an electronic media along with the hard copy of the bill, necessary enclosures and<br />

documents. The CONTRACTOR will ensure the correctness and consistency of data so<br />

entered with the hard copy of the bill submitted for payment.<br />

CONTRACTOR if required by OWNER / UIPL shall depute their skilled personnel for entering<br />

data in SAP system of OWNER for processing the CONTRACTOR’S bill without any extra cost.<br />

OWNER / UIPL will utilize these data for processing and verification of the CONTRACTOR’s bill.<br />

43.0 ARBITRATION