BHARAT PETROLEUM CORPORATION LTD Special Conditions of Contract<br />

CCR PROJECT , MAHUAL REFINERY- MUMBAI<br />

Sheet 9 of 29<br />

Engineer(s) depending upon the quantum of work. This QA / QC group shall be fully responsible to<br />

carryout the work as per standards and all code requirements. In case Engineer-in-charge feels that<br />

QA / QC Engineer(s) of CONTRACTOR are incompetent or insufficient, CONTRACTOR has to<br />

deploy other experienced Engineer(s) as per site requirement and to the full satisfaction of<br />

Engineer-In-Charge.<br />

g) In case CONTRACTOR fails to follow the instructions of Engineer-in-charge with respect to above<br />

clauses, next payment due to him shall not be released unless and until he complies with the<br />

instructions to, the full satisfaction of Engineer-in-charge.<br />

20.0 SITE ORGANISATION<br />

The CONTRACTOR shall without prejudice to his overall responsibility to execute and complete the<br />

Work as per specifications and time schedule, progressively deploy adequate qualified and<br />

experienced personnel together with skilled/ unskilled manpower and augment the same as decided<br />

by Engineer-in-Charge depending on the exigencies of work to suit the construction schedule<br />

without any additional cost to OWNER. The CONTRACTOR shall submit the details of minimum<br />

site organisation proposed by him, as per Proposal Form given in the Bidding document. In addition<br />

to this, CONTRACTOR shall deploy Safety Supervisors to ensure safer working conditions at site.<br />

In case where the works are Sub-Contracted by the main CONTRACTORs, Safety Supervisors are<br />

to be provided by the main CONTRACTOR only.<br />

21.0 MECHANISATION OF CONSTRUCTION ACTIVITIES AND MOBILISATION OF<br />

CONSTRUCTION EQUIPMENT<br />

a) Mechanisation of Construction Activities :The CONTRACTOR shall mechanise the<br />

construction activities to the maximum extent by deploying all necessary construction<br />

equipment/machinery in adequate numbers and capacities.<br />

b) Wherever Structural/ Piping works are included in the scope, the responsibilities of<br />

CONTRACTOR shall include pre fabrication and painting as per the specification in a<br />

workshop out side the Plant premise and to bring the prefabricated and painted<br />

structures as “Ready of Erection” to Pant with transportation facilities to site to carryout<br />

erection. CONTACTOR shall also responsible for preparing approaches to working areas for the<br />

movement/operation of cranes and leveling the areas for assembly / erection to ensure effective<br />

mechanisation on the works. OWNER shall provide only the Land for the storage. It shall be<br />

the responsibility of the CONTRACTOR to carry out leveling / dressing / grading with a<br />

proper approach for the movement of equipment and machinery, at his own cost. No extra<br />

payment shall be made by the OWNER for leveling / dressing / grading. The CONTRACTOR<br />

shall acquaint himself with availability of access, facilities such as railway siding, local labour etc.<br />

and the CONTRACTOR may have to bUIPLd temporary access roads to aid his work and the<br />

quoted and agreed rates shall be deemed to include the same.<br />

c) For speedy execution of work, CONTRACTOR shall also ensure use of computer software for at<br />

least the following:<br />

a) Billing<br />

b) Planning & Scheduling<br />

c) Progress Reporting<br />

d) Material Control & Warehousing<br />

e) Safety Records<br />

f) Resource Deployment<br />

g) Communication<br />

d) CONTRACTOR further agrees that Contract price is inclusive of all the associated costs, which<br />

he may incur for actual mobilization, required in respect of use of mechanized construction