BHARAT PETROLEUM CORPORATION LTD Special Conditions of Contract<br />

CCR PROJECT , MAHUAL REFINERY- MUMBAI<br />

49.0 Bid Evaluation: Refer Annexure 3 to SCC<br />

50.0 FORMAT FOR SUBMITTING PRICE: Refer Annexure 4 to SCC<br />

51.0 PACKAGE SPECIFIC CONDITIONS:<br />

Sheet 20 of 29<br />

Bidder shall comply with following conditions as a package supplier as the subject<br />

tender is a package tender:<br />

A. Following documents shall be submitted along with the BID:<br />

� Execution Plan<br />

� Bar Chart schedule<br />

� Project Organization Chart and proposed manpower schedule at site.<br />

� Details of the maximum load required to be handled for maintenance purpose and<br />

EOT Capacity with relevant inching facility required.<br />

� Proposed Plant & machineries deployment schedule.<br />

� Resume of key personnel to be deployed at site like for RCM, QA, Planning etc.<br />

� Minimum area required for storage/ fabn. Yard. ( Bidder to note that only<br />

limited area will be given for this & Contractor to plan the work such that<br />

maximum portion is fabricated out side the refinery complex. )<br />

B. Following procedures shall be implemented during the work execution:<br />

� Prepare & submit for approval of progress monitoring system, reporting system, project coordination<br />

procedures and project information system.<br />

� Quality control / quality assurance Plan / Inspection procedures in all areas (i.e. Design,<br />

Engineering, and Procurement, manufacturing, inspection, installation and<br />

Commissioning),<br />

� Maintain execution & progress through regular review / updating / amendment.<br />

� Prepare & submit for approval detail project schedule, identifying critical path, milestones,<br />

priority activities and target dates for completion.<br />

� Updating the Schedule on Monthly basis<br />

� Preparation and submission of document control index and monthly updating.<br />

� Hold monthly project review meeting with BPCL, UIPL, Licensors (if required) and subvendors,<br />

if applicable. Places of meeting will be discussed & decided time to time.<br />

� Submission of Erection Manual indicating the Erection logistics/Plan with sketches<br />

� Submission of C.V of key persons to engaged at work.<br />

� Submit as-built documentation in requisite format and copies before commencement of startup<br />

activities.