BHARAT PETROLEUM CORPORATION LTD Special Conditions of Contract<br />

CCR PROJECT , MAHUAL REFINERY- MUMBAI<br />

Sheet 10 of 29<br />

techniques and that the OWNER/ UIPL in this regard shall entertain no claim whatsoever.<br />

e) Mobilisation of Construction Equipments: The CONTRACTOR shall without prejudice to his<br />

responsibilities to execute and complete the work as per the specifications and time schedule,<br />

progressively deploy construction equipment, tools and tackles and further augment the same<br />

depending on the exigencies of work and as decided by the Engineer-in-Charge so as to suit the<br />

construction schedule within scheduled completion date without any additional cost to OWNER.<br />

The bidder shall submit a list of construction equipments he proposes to deploy for the subject<br />

work along with deployment schedule. No construction equipment shall be supplied by the<br />

OWNER.<br />

22.0 Work in Monsoon Season<br />

In addition to the clause No. 7 of Section – V (Performance of Work) of General Conditions of<br />

Contract CONTRACTOR shall submit with in 15 days of award of work, to the Engineer-in<br />

Charge / OWNER his contingency plan for work during monsoon clearly stating their<br />

methodology/ strategy to progress uninterruptedly during monsoon mentioning the deployment<br />

of resources viz, numbers, capacity, category of equipment and manpower on a weekly basis<br />

for approval.<br />

Minimum requirement by Contractor during Monsoon period is listed as below :<br />

a) Contractor must take due cognizance of the presence of rainy season / days in his scheduled<br />

completion period and accordingly, shall take all necessary actions to protect, reorganize and<br />

progress the work , uninterruptedly during the monsoon period .<br />

b) Contractor to collect all meteorological data from the local authority and collect necessary<br />

information about the intensity, frequency and period of rainy season.<br />

c) No extension of time due to interruption /suspension of work , water logging , reduced /slowing<br />

down of progress , non-availability of manpower etc. , whatsoever may be the reason, shall be<br />

tenable on account of monsoon and further no claim for stand-by of manpower and<br />

equipment, other resources etc shall be paid for.<br />

d) The successful bidder shall be required to submit within 15 days of Letter of Acceptance of<br />

offer / award of work, to the Engineer-in-Charge / BPCL his contingency plan for work during<br />

monsoon clearly stating their methodology / strategy to progress uninterruptedly during<br />

monsoon mentioning the deployment of resources viz, numbers, capacity, category of<br />

equipment and manpower on a weekly basis for approval. The contingency plan shall include<br />

all provisions for constructing and maintaining temporary infrastructure like approach road<br />

,temporary drains in and around work area , dewatering whether natural or forced to keep the<br />

work area free from water logging so as to maintain the same always in a state worthy of<br />

vehicular, human and equipment movement. The work area shall be so isolated as to restrict<br />

run-of from the adjacent areas in the work area / site.<br />

e) Contractor shall put up temporary sheds for fabrication of formwork and reinforcement. For<br />

fabrication of steelwork / piping proper rainproof shed with concretized floor of adequate area<br />

shall be made.<br />

f) Additionally, localized (structure wise) monsoon protection shall be provided in order to<br />

facilitate work.<br />

g) The contractor must indicate the structures / areas that he would like to progress (as per the<br />

project schedule and priority) particularly during the monsoon clearly indicating the subphases<br />

of construction like fabrication / erection works of Equipments / Piping etc.