Installation Manual - Future Pipe Industries
Installation Manual - Future Pipe Industries
Installation Manual - Future Pipe Industries
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fig. 5.2.d.<br />
- Apply <strong>Future</strong> <strong>Pipe</strong> <strong>Industries</strong> lubricant to the rubber ring and the entire inner surface of the socket end.<br />
- Avoid any lubricant under the rubber ring in order to prevent it from slipping out of the groove.<br />
Do not try to assembly the joint without the use of any lubricant. The standard lubricant can cause filters<br />
to block. <strong>Future</strong> <strong>Pipe</strong> <strong>Industries</strong> can supply lubricants which are soluble in water. Soft soap can be used<br />
as an alternative for the lubricant.<br />
- Fit the rubber lined clamps on both sides of the joint (fig. 5.2.e.).<br />
Fig. 5.2.e.<br />
- Ensure that the spigot end is positioned right in front of the socket end and that both sections are fully aligned.<br />
- Attach the chain tackles to the clamps on both sides of the parts to be connected and ease the spigot slowly<br />
and gradually into the socket until the mark is in line with the front of the socket end.<br />
- If in doubt, check with a thin feeler gauge around the circumference, to confirm that the rubber ring is in the<br />
right position in the groove.<br />
Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />
17