21.02.2013 Views

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fig. 5.2.d.<br />

- Apply <strong>Future</strong> <strong>Pipe</strong> <strong>Industries</strong> lubricant to the rubber ring and the entire inner surface of the socket end.<br />

- Avoid any lubricant under the rubber ring in order to prevent it from slipping out of the groove.<br />

Do not try to assembly the joint without the use of any lubricant. The standard lubricant can cause filters<br />

to block. <strong>Future</strong> <strong>Pipe</strong> <strong>Industries</strong> can supply lubricants which are soluble in water. Soft soap can be used<br />

as an alternative for the lubricant.<br />

- Fit the rubber lined clamps on both sides of the joint (fig. 5.2.e.).<br />

Fig. 5.2.e.<br />

- Ensure that the spigot end is positioned right in front of the socket end and that both sections are fully aligned.<br />

- Attach the chain tackles to the clamps on both sides of the parts to be connected and ease the spigot slowly<br />

and gradually into the socket until the mark is in line with the front of the socket end.<br />

- If in doubt, check with a thin feeler gauge around the circumference, to confirm that the rubber ring is in the<br />

right position in the groove.<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!