21.02.2013 Views

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.2. Unloading<br />

The unloading of material is the responsibility of the client, unless agreed otherwise.<br />

Because of the relative lightness of glassfibre reinforced plastics (approximately a quarter compared to steel) handlers<br />

may be tempted to handle it roughly, or unload it by letting it drop of its own accord. This may cause serious damage<br />

to the material and therefore Wavistrong material should be handled with care.<br />

Fig. 2.2.a.<br />

Do not use chains, steel cables or clamps during lifting. Nylon or canvas hoisting belts with a minimum width of 10 cm<br />

must be used. Standard pipe lengths must be picked up at two supporting points. Ensure that hoisting belts are always<br />

put round the widest part. We strongly recommend that the pipes are unloaded one at a time when hoisting belts<br />

are used. Each consignment is carefully loaded and must be inspected on site in order to ensure that no damage has<br />

occurred during transportation. This will avoid disputes with regards to responsibilities.<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!