10.10.5.<br />

10.10.6.<br />

Using the rolling ring construction pipes going onto the wall should be provided with a guide-way in order to<br />

allow the ring to roll between pipe and wallcasting. The diameter of the guide-way should be a minimum of:<br />

the outer diameter of the pipe + 2x diameter of the O-ring.<br />

Fig. 10.10.5.a.<br />

The wall penetration consists of a steel pipe provided with flanges. One of these flanges is profiled to fit<br />

the shape of the sealing element. By tightening the nuts the seal will be pressed in the wedge-shaped space<br />

between flange and pipe, thus creating an excellent seal.<br />

Fig. 10.10.6.a.<br />

min. 100 mm. min. 100 mm.<br />

When a pipe has to pass through a wall, the outside of the pipe must be protected by a flexible material<br />

(a rubber layer, with a minimum thickness of 5 mm) protruding some 100 mm outside the wall at each side.<br />

In order to allow for setting of the adjoining pipe sections, flexible couplings must be installed on both sides<br />

of the wall. Joints must not be located at a distance of more than 1 x ID outside the wall, with a maximum<br />

of 0.5 m.<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />

58<br />

concrete pit wall<br />

rubber