2. Handling of R.T.R.P. material: Transport and storage<br />

2.1. Loading<br />

<strong>Pipe</strong>s, fittings and prefabricated parts (spools) have to be transported by suitable trucks. These trucks must have flat<br />

floors. Check for and remove any projections or nails etc. before each load. Materials must be secured for example<br />

by using wedges and wooden supports. These supports must have a minimum width of 10 cm, avoiding sharp edges.<br />

Usually the materials are tied in place, using pliable nylon or canvas slings. Chains or steel cables may not be used<br />

under any circumstances.<br />

Fig. 2.1.a.<br />

The support distances must not exceed 2.5 m. The width of the supports must be a minimum of 10 cm. When pipes<br />

are inserted (one inside the other), the support distance shall not exceed 2 m. Flanges must be secured against sliding.<br />

Flanges may only be loaded on their sealing face if they are sufficiently protected against damage.<br />

Fig. 2.1.b.<br />

The best way for fittings to be transported is in crates or onto pallets. Direct contact between products during transport<br />

must be avoided.<br />

<strong>Pipe</strong> ends and machined parts must be protected, for example, by means of straw mats covered by polyethylene sheet<br />

or polyethylene netting. <strong>Pipe</strong>s and spools should be lifted by using nylon or canvas hoisting belts with a minimum<br />

width of 10 cm and must be lifted at two points, using the largest diameter of the prefabricated part (spool), in such<br />

a way that the weight is well-balanced.<br />

Any part of the truck has to be protected by wood or rubber wherever in contact with the products. We recommend<br />

the use of trucks which can be loaded from the sides. If pipes are handled by a forklift truck, the forks must be covered<br />

with rubber or plastic.<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />