21.02.2013 Views

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fig. 10.2.b.<br />

Support distance<br />

When using non locked rubber seal joints or mechanical couplers, pipelines must be anchored at each<br />

change in pipe direction, to prevent the pipes coming apart.Sideways movement is prevented by clamping.<br />

Where mechanical couplers are fitted, sideways movement can be avoided by scuring the coupler itself.<br />

Fig. 10.2.c. Fig. 10.2.d.<br />

LO<br />

Please note that rubber seal lock joints must be fully extended. This means that the locking strip is pinched<br />

between the stop in the socket and the stop in the spigot end. This prevents movement of pipe sections and overloading<br />

at bends and tees. Mechanical stretching is preferable; the results can be seen by inspection of the position of the<br />

locking strip through the insert hole. Extending can also be done by pressurizing the main line (0.8 x working pressure).<br />

Take care that the pipe sections are not pushed off their supports. In order to prevent this the lower part of the clip<br />

should be tightened temporarily and the upper part of the clip should be loosened. Relocate any moved pipe clips<br />

in their original position.After fully extending, the branch pipe sections can be installed.<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />

47<br />

Max. 0,2 LO

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!