7.5. Laminating<br />
Grind the surface (ensure the top coating is removed) and remove the dust using a clean dry cloth or brush to ensure<br />
a good adhesion between fit layer and laminate. The work must continue within the hour, otherwise the grinding and<br />
cleaning operation will have to be repeated. Ensure that tolerances are not exceeded!<br />
The laminate should be built up following the procedure already mentioned. The woven rovings, the application<br />
of resin/hardener mix and the correct sequence of building up the woven rovings must be done according to the<br />
instructions on the lamination kit. Remove excess resin using a rubber spatula.<br />
7.6. Curing<br />
The lamination will harden at ambient temperatures. This can be speeded up by applying heat using for example,<br />
an infra red device or hot air gun. The hardening process needs to be done gradually (see fig. 7.6.a.).<br />
After the lamination is no longer sticky, curing can be continued with the aid of heating blankets, hot air guns or<br />
ovens. Heating up to the curing temperature should also be performed gradually. The curing time only starts when<br />
the laminate has reached the correct curing temperature.<br />
The joint is ready and can be tested when the laminate is fully cured and has cooled down.<br />
Fig. 7.6.a.<br />
temperature o<br />
C<br />
heating<br />
time<br />
50 o<br />
gelling<br />
heating hardening cooling<br />