7.5. Laminating<br />

Grind the surface (ensure the top coating is removed) and remove the dust using a clean dry cloth or brush to ensure<br />

a good adhesion between fit layer and laminate. The work must continue within the hour, otherwise the grinding and<br />

cleaning operation will have to be repeated. Ensure that tolerances are not exceeded!<br />

The laminate should be built up following the procedure already mentioned. The woven rovings, the application<br />

of resin/hardener mix and the correct sequence of building up the woven rovings must be done according to the<br />

instructions on the lamination kit. Remove excess resin using a rubber spatula.<br />

7.6. Curing<br />

The lamination will harden at ambient temperatures. This can be speeded up by applying heat using for example,<br />

an infra red device or hot air gun. The hardening process needs to be done gradually (see fig. 7.6.a.).<br />

After the lamination is no longer sticky, curing can be continued with the aid of heating blankets, hot air guns or<br />

ovens. Heating up to the curing temperature should also be performed gradually. The curing time only starts when<br />

the laminate has reached the correct curing temperature.<br />

The joint is ready and can be tested when the laminate is fully cured and has cooled down.<br />

Fig. 7.6.a.<br />

temperature o<br />

C<br />

heating<br />

time<br />

50 o<br />

gelling<br />

heating hardening cooling<br />