9.3.1. Other methods of back filling<br />

Use of the saturation method does not give any better results than the method already described. If the saturation<br />

method is used the compaction may be disturbed. Ensure the pipe does not float and the sides are not eroded during<br />

water injection. Do not backfill if the ground is already saturated. This method may only be used for free draining soils<br />

or when the drainage pumps are kept running and the pipe system is completely filled with water.<br />

9.3.2. <strong>Pipe</strong> systems to be cast in concrete<br />

Do not pour concrete directly onto the pipe. Compacting in the surronding area of Wavistrong pipes is not allowed.<br />

The vibrating needle must be kept at least 30 cm from the pipe.Prior to casting, the pipe system must be pressure<br />

tested (see chapter 11). In order to prevent the pipe from floating concrete cradles provided with steel clamps and rubber<br />

lining can be used (see fig. 9.3.b.). Support distance has to be calculated. Consult <strong>Future</strong> <strong>Pipe</strong> <strong>Industries</strong>. Buckling of<br />

the pipe during casting can be prevented by pressurizing the system. This also reduces the bending caused by the boyancy<br />

of the pipe. Please note that as the concrete sets there will be shrinkage and this will increase the pressure in the<br />

system. Ensure the permitted pressure is not exceeded by the use of pressure relief valves.<br />

Fig. 9.3.b.<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />

39