If the trench wall is of a soil type which gives insufficient support, the trench can be widened and backfilled with<br />

a high degree of compaction (min. 90% Proctor and 70% relative density). Alternatively, support sheeting may be<br />

left in place. The trench floor must be stabilised if it is very soft or uneven is expected.<br />

Fig. 9.1.c.<br />

supporting partition<br />

backfilling material<br />

All sharp particles must be removed from the trench floor before pipe installation. A hard uneven trench floor should<br />

be loosened to prevent point loading. Alternatively the trench floor can be deepened by about 15 cm below the<br />

recommended installation level and this area can be filled with sand or gravel (max. particle size 20 mm) after which<br />

it must be compacted to a degree of compaction at least equal to the backfill material.In order to achieve sufficient<br />

compaction of the sidefill and to have pressures in the sidefill material well distributed and transmitted to the trench<br />

walls, the width of the trench at the crown level of the pipe should be at least:<br />

for pipes ≤ 250 mm : W= Diameter of pipe + 30 cm<br />

for pipes > 250 mm : W= Diameter of pipe + 50 cm<br />

W<br />

From approximately 30 cm above the crown of the pipe the trench may have any width. Additionally this sub-ditch will<br />

lower the load on the pipe. The minimum depth is at least 0.5 m but this depends on pipe class, service conditions,<br />

soil conditions and wheelload. The crown of the pipe must be installed below frost level.<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />

35<br />

20 cm<br />

0,3 x ID<br />

first<br />

back filling zone<br />

~15 cm<br />

~15 cm<br />

excavated soil<br />

compacting in layers<br />

layers of 15 cm<br />

second back filling zone<br />

compacting in<br />

lagen van 15 cm<br />

bedding<br />

foundation