G Unprotected flange-faces should never be placed directly on the ground or on concrete floors.<br />
H If any damage during transportation or installation is noticed such as scratches, cracks or pits,<br />
<strong>Future</strong> <strong>Pipe</strong> <strong>Industries</strong> should be contacted for any repair or replacement. Never use any damaged material!<br />
I Crystallisation can take place at temperatures lower then 20°C The resin is then milky in appearance and<br />
is congealed. The resin can be made liquid again by re-heating it. A temperature of between 40°-50°C<br />
is required for this purpose. Before mixing the resin and hardener for use, the resin must be stirred thoroughly.<br />
Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />