21.02.2013 Views

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

Installation Manual - Future Pipe Industries

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.4. <strong>Installation</strong> time for the rubber ring joints<br />

Estimated installation times for the rubber ring joints on site are shown in table 5.f. and 5.g.<br />

These estimated times are based on<br />

- uninterrupted work<br />

- enough space and an open trench for underground applications, etc.<br />

- an installation crew of 3 persons (two in the trench, one outside)<br />

- excluding the handling of the pipe<br />

Table 5.f. <strong>Installation</strong> time<br />

ID (mm) Time (min.)<br />

80 5<br />

100 5<br />

150 5<br />

200 10<br />

250 15<br />

For diam. > 250 mm it has been taken into account that the pipe will be moved using the excavator.<br />

Table 5.g. <strong>Installation</strong> time<br />

Time for clamping<br />

ID (mm) and assembly of<br />

the joint (min.)<br />

300 15<br />

350 15<br />

400 15<br />

450 20<br />

500 20<br />

600 20<br />

700 20<br />

750 25<br />

800 25<br />

900 25<br />

1000 30<br />

1200 30<br />

Wavistrong <strong>Installation</strong> <strong>Manual</strong><br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!