- Page 1 and 2:
open house international w w w . o
- Page 3 and 4:
Contents o pe n ho use inte rnat io
- Page 5 and 6:
Previous Issues Vol.36 No.2 2011 OP
- Page 7 and 8:
Editorial The composition and subje
- Page 9 and 10:
Figure 1. Lima: the PREVI quarter t
- Page 11 and 12:
Figure 3. Remodelling of PREVI hous
- Page 13 and 14:
Table 1. The three PREVI-PP1 techno
- Page 15 and 16:
Figure 9&10. Tabibloc: rationalised
- Page 17 and 18:
to evaluating technical capabilitie
- Page 19 and 20:
nition and custom treatment’ at t
- Page 21 and 22:
Industrialised Building System (IBS
- Page 23 and 24:
Table 2. Correspondence between sat
- Page 25 and 26:
Table 5. Aspects of respondents’
- Page 27 and 28:
Table 9. Counts on renovation jobs
- Page 29 and 30:
LARSON, K., INTILLE, S., MCLEISH, T
- Page 31 and 32:
2008). Disaster preparedness relies
- Page 33 and 34:
especially when these agencies have
- Page 35 and 36:
STR ATEGIC PLANNING OF POST-DIS- A
- Page 37 and 38:
housing. The Ministry awarded the w
- Page 39 and 40:
Table 1. Importance placed on the v
- Page 41 and 42:
JOHNSON C. 2007, Impacts of prefabr
- Page 43 and 44:
Figure 1. Map of Old Seoul, the cir
- Page 45 and 46:
Figure 3. Remodeled hanoks in Bukch
- Page 47 and 48:
Figure 5. Although contemporary han
- Page 49 and 50:
R EF ERENCES ANDERSON, B.R. 1983, I
- Page 51 and 52:
cases, have been exclusively occupi
- Page 53 and 54:
typical floors with standard plans
- Page 55 and 56:
design creates a relationship betwe
- Page 57 and 58: healthier building. Finally, Yeang
- Page 59 and 60: Figure 7 a&b. The sky bridges as pu
- Page 61 and 62: ing as a shading device. As the mai
- Page 63 and 64: Figure 10. The reconsideration of t
- Page 65 and 66: Figure 12. A diagram for the propos
- Page 67 and 68: pleasant environment for residents
- Page 69 and 70: (roof and facade) in whole or part;
- Page 71 and 72: DED [Department of Economic Develop
- Page 73 and 74: Abstract ENVIRONMENTS OF CHANGE: AN
- Page 75 and 76: of the poor in identifying and occu
- Page 77 and 78: Figure 1. Location of Phumolong inf
- Page 79 and 80: Figure 3. View of the informal sett
- Page 81 and 82: ate assembly. Hydraform dry-stackin
- Page 83 and 84: Figure 8. Phased growth of building
- Page 85 and 86: Abstract Ahmed Abu Al Haija Hundred
- Page 87 and 88: disciplinary approach, proposing so
- Page 89 and 90: egorize the different kinds of stru
- Page 91 and 92: Figure 8. Schematic plan of dwellin
- Page 93 and 94: Bardeschi, 2004). C ONC LU SIONS Th
- Page 95 and 96: Abstract A READING IN CRITICAL REGI
- Page 97 and 98: artificial, visual and tactile, myt
- Page 99 and 100: tion of the built environment (Fram
- Page 101 and 102: (Tümertekin, 2010). Tümertekin be
- Page 103 and 104: Figure 14. Rear View of the SM Hous
- Page 105 and 106: Figure 16. B2 House (photo by Cemal
- Page 107: DECISION MAKING FOR FLEXIBILITY IN