q) Plat<strong>for</strong>ms & cross over to be provided <strong>for</strong> the operation and maintenance of<br />

the equipments installed in the skid. Proper spacing to be maintained<br />

between the equipments <strong>for</strong> operation & maintenance. The vent & drains<br />

shall be properly supported in the skid. All the vents shall be at a height of<br />

minimum 3 meters above the working plat<strong>for</strong>ms.<br />

r) All the softwares used in the system and as specified elsewhere, licensed in<br />

the name of <strong>GAIL</strong> (I) Ltd. All the hardware and software required <strong>for</strong><br />

calibration and using diagnostic features of supplied instruments like Flow<br />

meters, Flow computers, gas chromatograph etc.<br />

s) All pipes, tubings, fittings, valves, gaskets, bolts, nuts, spades, etc., within<br />

the skid battery limit.<br />

t) Earth bonding system and earthing boss.<br />

u) Lifting lugs and spreader beam / frame, foundation Anchor bolts,<br />

copper jumpers <strong>for</strong> flanges <strong>for</strong> the skid (Lifting lugs and their<br />

supporting structure shall be designed <strong>for</strong> load equal to two times<br />

the weight to be lifted); All Tie-ins with flanged connections shall be<br />

in bidder’s scope. Details of skid assembly, supporting positions,<br />

Anchor bolt layout and equipment weights to be provided prior to<br />

equipment supply<br />

v) (shipping weight). The detailed stress analysis of the skid structure<br />

and frames shall be submitted by the vendor.<br />

w) Stainless steel nameplate <strong>for</strong> each tagged equipment and<br />

component.<br />

x) All Tie-ins (flanged connections) with nuts and bolts.<br />

y) Inlet and Outlet matching flanges and Studs & nuts, suitable gaskets<br />

shall also be supplied along-with the skid. In case a single Pilot/<br />

spring is not capable of meeting the pressure set point requirement,<br />

additional spring and / or pilot shall be provided along with the<br />

Pressure Regulators and Slam shut valves.<br />

z) The sun / rain protection shed <strong>for</strong> electronic instruments shall also<br />

be supplied by the bidder<br />

aa) A structural skid complete with necessary drip pan, walkways,<br />

staircase, plat<strong>for</strong>ms, gratings, handrails <strong>for</strong> access <strong>for</strong> operation and<br />

maintenance.<br />

bb) Status Indications required <strong>for</strong> Metering inlet and outlet Ball valves<br />

(mainline) and Slam Shut Valves, as indicated in typical Schematic<br />

shall be provided in flow computer and control panel (supplied with<br />

skid). Status indication of both SSV shall be available on both the<br />

Flow computers. Inlet Pressure and temperature shall be available on<br />

the both Flow computers. Signal from Limit switch of SSV and<br />

metering Inlet Ball Valve and outlet ball valve shall go to Flow<br />

Computer and from FC to <strong>GAIL</strong> SCADA. Status data, FC data, Gas<br />

Composition, FCV set point etc shall also be available (R/W) through<br />

GSM modem/ SCADA<br />

<strong>GAIL</strong> (INDIA) LTD<br />

NEW DELHI<br />

SCOPE OF WORK<br />

DOCUMENT NO. REV-0<br />

0015-01-08-06-001-SW<br />

Page 15 of 43<br />

Copyright <strong>GAIL</strong> – All rights reserved