1.0 GENERAL<br />

1.1 This document describes in detail the scope of work, supply and responsibilities of<br />

Contractor <strong>for</strong> procurement of natural gas USM based Check metering system <strong>for</strong> Auraiya<br />

and USM based Metering Skid <strong>for</strong> supplying gas to KFCL, Kanpur. In this contract USM<br />

based two stream metering system and skid is envisaged. Each of the two independent<br />

streams of metering system and skid (1 operating + 1 standby) shall be designed to cater<br />

max. (rated) flow capacity mentioned elsewhere. Bidder shall size and provide indicative<br />

size / dimension of complete skid along with P&ID / GAD of metering Skid.<br />

The scope of work/ supply includes Design, Engineering, Manufacturing, Inspection,<br />

Testing, and Supervision <strong>for</strong> Installation & commissioning of, metering system (skid<br />

mounted, consisting of two independent streams of flow measurement (through USM)<br />

along with, necessary control panel, valves, piping, instruments & fittings) and Metering<br />

skid (consisting of two independent streams of Filtration, Pressure Reduction system, flow<br />

measurement (through USM) along with GC, FCV, metering supervisory system,<br />

necessary control panel, valves, piping, instruments & fittings).<br />

The Required Flow capacity, Location, Quantity, type of meter, panel, etc in the Metering<br />

system and Skid is as under:<br />

S.N. Customer Name Gas Demand<br />

(MMSCMD)/<br />

<strong>GAIL</strong> (INDIA) LTD<br />

NEW DELHI<br />

SCOPE OF WORK<br />

Type of Meter<br />

Facilities envisaged<br />

1 Check Metering Station at Auraiya 6, USM Metering system, Panel<br />

mounted FC, 1 laserjet<br />

Printer, Laptop, Hand<br />

held configurator, LEL<br />

detection system(min 2<br />

LEL detectors)<br />

2 M/S KFCL 2, USM Filtration system,<br />

Metering system,<br />

Pressure reduction<br />

system, FCV, GC,<br />

Metering Supervisory<br />

system, Panel mounted<br />

FC, 2 laserjet Printers,<br />

Laptop, Hand held<br />

configurator, LEL<br />

detection system (min<br />

6 LEL detectors)<br />

1.2 The description and requirements contained in this <strong>specification</strong> are concise by<br />

necessity and cannot include all details. However, it is the responsibility of the<br />

contractor to execute the job on a turnkey basis in accordance with the<br />

<strong>specification</strong>s and internationally recognized good engineering practices.<br />

DOCUMENT NO. REV-0<br />

0015-01-08-06-001-SW<br />