egulating the sample pressure & flow. The sample flow should be controlled by a needle valve<br />

and flow should be indicated through Rota meter. The enclosure <strong>for</strong> calibration gas system<br />

should have heating system with insulating jacket (uni<strong>for</strong>mly to all parts of cylinders) so as to<br />

maintain minimum temperature required <strong>for</strong> stability of certified composition. The sample<br />

conditioning system should be field mounted & adjacent to the sampling point of the pipeline.<br />

Analyzer Unit and Programmable control Unit<br />

The function of this unit will be to analyze the gas sample, do the calculation of Heating Value,<br />

Relative Density (specific gravity), Compressibility Factor etc. and provide in<strong>for</strong>mation to<br />

interface / display unit. The technical details of this unit are given as under:<br />

i. Type: Continuous On-line Gas Chromatograph<br />

ii. No. of streams: single stream<br />

iii. a) Column: Micro pack / MEMS column with high resolution and low carrier gas<br />

consumption<br />

b) Column size (length / diameter): By vendor<br />

iv. Detector: Thermal conductivity detector<br />

v. Carrier gas:<br />

a) Ultra-pure Helium gas along with pressure regulators and Rota Meter flow-indication.<br />

The consumption of carrier gas should be as low as possible.<br />

b) Flow rate: the minimum possible (to be defined by the bidder)<br />

vi Cycle time: Operator / user assignable (5 minutes maximum).<br />

vii. Analyser:<br />

a) The design of Analyser should be based on solid-state electronics with protection<br />

from industrial EMI /RFI Interference.<br />

b) Inputs / Outputs: It should communicate digitally to interface / display unit to send<br />

the analysis related in<strong>for</strong>mation.<br />

c). Analyzer & analyzer electronics should be supplied with prefabricated / installed<br />

tube connection etc., so that field tubing etc. to be done as minimum as possible<br />

at site <strong>for</strong> connection of sample line & carrier gas and calibration gas cylinders<br />

d) Functions: Control of all analysis functions in a cycle from operation of sampling<br />

valves to detection of peaks and precise calculations <strong>for</strong> peak measurements,<br />

area integration and internal normalization. Average values of analysis and<br />

computed results <strong>for</strong> 8 and 24 hours shall be available automatically or on demand.<br />

Also generation of gas analysis report (scheduled or on-demand) and<br />

average report (8 hourly average, 24 hourly averages) <strong>for</strong> gas composition,<br />

calorific values and specific gravity.<br />

viii. Calibration: Automatic calibration with user selectable time intervals or manually on<br />

demand as & when required. To accurately determine the relative response factors<br />

with/without single component calibrations such as high purity methane. Vendor shall indicate<br />

the accuracy and repeatability of the measurement achieved by the calibration method<br />

adopted. Also during calibration period the stream composition data of previous analysis shall<br />

be used in Flow computer. Also if the calibration results are out of range then it shall be<br />

alarmed. The composition data during alarm condition shall be rejected and shall not be used<br />

<strong>for</strong> Flow computation.<br />

<strong>GAIL</strong> (INDIA) LTD<br />

NEW DELHI<br />

JOB SPECIFICATION FOR GAS METERING<br />

SYSTEM / SKID<br />

JOB SPECIFICATION REV-0<br />

0015-01-08-02-001<br />

Page 29 of<br />

35<br />

Copyright <strong>GAIL</strong> – All rights reserved