24.02.2013 Views

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

c) Fabrication details of all valves.<br />

d) Welding, Heat treatment and Testing procedures.<br />

e) Details of corrosion resistant paint to be applied on the valves.<br />

Manufacture of valves shall commence only after approval of the above documents.<br />

Once, the approval has been given by Purchaser, any changes in design, material<br />

and method of manufacture shall be notified to Purchaser whose approval in writing<br />

of all changes shall be obtained be<strong>for</strong>e the valve is manufactured.<br />

9.3 Within 30 days from the approval date, Manufacturer shall submit to Purchaser one<br />

reproducible and six copies of all approved drawings, documents and <strong>specification</strong>s<br />

as listed in clause 9.2 above.<br />

9.4 Prior to shipment, Manufacturer shall submit to Purchaser one reproducible and six<br />

copies of the following:<br />

a) Test certificates as listed in clause 6.0 of this <strong>specification</strong>.<br />

b) Manual <strong>for</strong> installation, <strong>erection</strong>, maintenance and operation instructions<br />

including a list of recommended spares <strong>for</strong> the valves.<br />

All documents shall be in English language only.<br />

<strong>GAIL</strong> (INDIA) LTD<br />

NEW DELHI<br />

SPECIFICATION REV-0<br />

STANDARD SPECIFICATION FOR<br />

Page 13 of 14<br />

PIPELINE PLUG VALVES S – 04 – 02 – 008<br />

Copyright <strong>GAIL</strong> – All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!