24.02.2013 Views

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.0 MATERIALS SUPPLY<br />

7.1 Materials to Be Supplied By The Owner Free Of Cost<br />

7.1.1 All pipes, tubes and piping materials such as fittings, steam traps, valves, flanges,<br />

gaskets, bolts and nuts <strong>for</strong> flanges necessary <strong>for</strong> primary piping, air supply and steam tracing.<br />

7.1.2 Tubes, tube fittings, polyethylene tubes and fittings.<br />

7.1.3 All field mounted instruments like pneumatic, electronic and analyzer instruments,<br />

pressure gauges, temperature elements, dial thermometers, thermowells, switches and<br />

accessories like air filter regulators, receiver pressure gauges, solenoid valves etc.<br />

7.1.4 Pneumatic and electric junction boxes <strong>for</strong> field mounting.<br />

7.1.5 Single pair/single triad/multi-pair/multi triad shielded cables/Thermocouple extension<br />

cables <strong>for</strong> signal/alarm/temperature signals and any other special cable specifically indicated in<br />

'Schedule of Quantities'<br />

7.1.6 Two core/three core power cable.<br />

7.1.7 All electrical conduits, fittings, cable glands and cable accessories unless otherwise<br />

specifically indicated.<br />

7.1.8 Local panels.<br />

7.2 Materials to be supplied by the contractor at his own cost, as part of this<br />

<strong>specification</strong><br />

7.2.1 The procurement and supply in sequence and at the appropriate time of all materials<br />

and consumables except <strong>for</strong> the materials specifically enlisted under Owner's scope of supply<br />

shall be entirely the contractor's responsibility and his rates <strong>for</strong> execution shall be inclusive <strong>for</strong><br />

all these items. These are as, but not limited to, the following:-<br />

a) All industrial gases like oxygen, acetylene or inert gases, compressed air and all types of<br />

electrodes, brazing rods, flux etc. <strong>for</strong> welding purpose, with necessary facilities <strong>for</strong> testing the<br />

welded joints.<br />

b) PTFE tape and other pipe jointing compounds <strong>for</strong> threads and material <strong>for</strong> sealing of cable<br />

entries to control room, local panels, insulation tapes, sealing compounds <strong>for</strong> flame proof'<br />

conduit fittings.<br />

c) Bolts and nuts <strong>for</strong> supports, U-bolts with nuts, clamps <strong>for</strong> tubes and pipes, anchor bolts <strong>for</strong><br />

panels, expansion bolts (pinch anchor/rawl bolts) of various sizes <strong>for</strong> fixing to concrete<br />

structures. Polythene bags <strong>for</strong> protection of instruments against rain.<br />

d) Paints, primers and solvents.<br />

e) Plastic tags <strong>for</strong> identifications of tubes/wires at panel junction boxes.<br />

f) All materials <strong>for</strong> minor civil works like grouting etc.<br />

g) Structural steel, MS Plates, GI plates, flats, pipe etc. required <strong>for</strong> fabrication or instruments<br />

supports and tray supports wherever required.<br />

h) All accessories <strong>for</strong> electrical wiring like cable lugs, ferrules <strong>for</strong> identification etc.<br />

7.2.2 Prefabricated main cable ducts and per<strong>for</strong>ated/ladder trays with necessary accessories<br />

like tees bends, crosses etc. as specified in Schedule of quantities.<br />

7.2.3 Mounting accessories <strong>for</strong> the above like bolts, supports etc.<br />

7.2.4 Spool pieces and blinds <strong>for</strong> testing wherever required.<br />

7.2.5 Any other item not specified, but required <strong>for</strong> the completion of the job.<br />

<strong>GAIL</strong> (INDIA) LTD<br />

NEW DELHI<br />

STANDARD SPECIFICATION FOR<br />

ERECTION<br />

SPECIFICATION REV-1<br />

S-08-02-002<br />

Page 16 of<br />

17<br />

Copyright <strong>GAIL</strong> – All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!