24.02.2013 Views

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Company<br />

symbol(insert<br />

FAT CHECK LIST<br />

FLOW COMPUTER<br />

Project: Ultrasonic FLOW METER BASED METERING SKID FOR <strong>GAIL</strong><br />

Customer: M/s <strong>GAIL</strong> INDIA LTD, New Delhi<br />

P.O. No.: ------------------ Dtd. -----------------------<br />

Tag No.: Stream-2<br />

Inspection / Simulation done <strong>for</strong> CHECKED/ OBSERVED REMARKS<br />

Volumetric Flow rate (SCMH) Ο Accepted Ο Rejected<br />

Totaliser ( SCM) Ο Accepted Ο Rejected<br />

Mass Flow rate (kg/ hr) Ο Accepted Ο Rejected<br />

Energy Flow rate (Kcal/ hr) Ο Accepted Ο Rejected<br />

Pipe Line Temperature °C Ο Accepted Ο Rejected<br />

Pipe Line Pressure Kg/Cm2g / Bar(g) Ο Accepted Ο Rejected<br />

Atmospheric pressure entry at site condition Ο Accepted Ο Rejected<br />

Base Pressure/ Base Temperature entry Ο Accepted Ο Rejected<br />

Configuration check, parameter settings Ο Accepted Ο Rejected<br />

PID controller Analog O/P check Ο Accepted Ο Rejected<br />

Functioning of PID loop <strong>for</strong> FCV by simulation Ο Accepted Ο Rejected<br />

Interface data of flow computer with<br />

Ο Accepted Ο Rejected<br />

RTU – Measurement by Laptop<br />

Various Units of measurement<br />

Ο Accepted Ο Rejected<br />

( Flow rate in MMSCMD or SCM/Hr, heating<br />

value in Kcal/SCM, energy in MMBTU)<br />

Flow computer o/p to SCADA by GSM modem Ο Accepted Ο Rejected<br />

GC data input to Flow computer from Ο Accepted Ο Rejected<br />

SCADA via GSM modem<br />

K factors <strong>for</strong> meter error curves Ο Accepted Ο Rejected<br />

Audit trail printout (to be attached) Ο Accepted Ο Rejected<br />

Software <strong>for</strong> flow calculation verification Ο Accepted Ο Rejected<br />

_____________________ _____________________ _____________________<br />

Company Representative TPIA <strong>GAIL</strong>’s representative<br />

Date :<br />

FACTORY ACCEPTANCE TEST<br />

DOCUMENT NO. REV-0<br />

Page 18 of 28<br />

Copyright <strong>GAIL</strong> – All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!