24.02.2013 Views

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

standard specification for erection tender - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Gas Gr. IIA & IIB Temp T3. All analyzer components located in hazardous areas must<br />

meet the electrical classification of that area.<br />

6.1.13 Analyzer shall be selected <strong>for</strong> high accuracy and repeatability as the primary criteria.<br />

Analysis speed and cycle time is secondary <strong>for</strong> custody transfer purposes.<br />

6.1.14 Analyzer and sample system shall be suitable <strong>for</strong> outdoor installation in the field.<br />

Minimum of IP66 protection shall be provided.<br />

6.1.15 A sunshade and a three-side weather shelter shall be provided to protect the Analyzer<br />

and sample system.<br />

6.1.16 Power supply <strong>for</strong> the gas chromatograph system shall be 24 VDC / 230 Volts ac from<br />

the purchasers electrical supply system. VENDOR shall provide the power requirements<br />

of the system.<br />

6.2 SAMPLE SYSTEM<br />

6.2.1 Vendor shall provide a fabricated assembly of sample conditioning system having facility to<br />

measure sample flow to the chromatograph proper.<br />

6.2.2 Sampling system design should be such that the sample drawn <strong>for</strong> analysis is truly<br />

representative of the process stream. The unit shall be supplied with all equipment necessary to<br />

condition each stream <strong>for</strong> injection into the chromatograph. The system must include, but not<br />

limited to, all Regulators, vaporizers, dryers, filters, rotameter, solenoid valves required <strong>for</strong><br />

proper analysis. All Components of sampling system shall be rated <strong>for</strong> the mechanical design<br />

pressure and temperature conditions indicated in purchaser's data sheet.<br />

6.2.3 Transportation time <strong>for</strong> the sample from the process tapping point upto the sampling system<br />

shall not exceed 30% of the cycle time specified <strong>for</strong> the chromatograph.<br />

6.2.4 The sampling system shall contain at least one wire mesh strainer of US <strong>standard</strong> sieve mesh<br />

size 100 or finer. Where purchaser's data sheets indicate greater possibilities of plugging,<br />

vendor shall provide more filters/separators as required.<br />

6.2.5 Where purchaser's data sheets indicate possibilities of polymer <strong>for</strong>mation on presence of excess<br />

polymers, vendor shall offer suitable design features to minimize plugging because of polymer<br />

residue.<br />

6.2.6 Wherever the process stream pressure is low, vendor shall provide/ advise the purchaser on<br />

use of aspirators or sample pumps. Vendor shall also indicate the utility requirements (e.g water<br />

or air) <strong>for</strong> such devices.<br />

6.2.7 Sampling system shall include provisions <strong>for</strong> connection of calibration <strong>standard</strong>.<br />

6.2.8 Sampling system shall include block valves on all process sampling lines.<br />

<strong>GAIL</strong> (INDIA) LTD<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

FOR<br />

GAS CHROMATOGRAPH<br />

SPECIFICATION<br />

S-08-02-025<br />

REV-0<br />

Page 9 of 17<br />

Copyright <strong>GAIL</strong> – All rights reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!