10.04.2013 Views

Appendix CRF - Part 3 - Northamptonshire County Council

Appendix CRF - Part 3 - Northamptonshire County Council

Appendix CRF - Part 3 - Northamptonshire County Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Radiological Assessment 0820-2<br />

Version 2<br />

Cell<br />

Basal area<br />

(m 2 )<br />

Surface area<br />

(m 2 )<br />

Void volume<br />

(m 3 )<br />

1A 12,866 15,195 268,072<br />

Western<br />

extension<br />

2,000 2,396 13,080<br />

1B 11,934 11,934 193,865<br />

2A 12,449 12,449 187,900<br />

2B 10,464 11,822 143,010<br />

3A 8,412 13,922 160,877<br />

3B 9,090 11,624 174,685<br />

4A 11,144 14,097 174,564<br />

4B 12,552 12,552 206,102<br />

5A 6,929 11,669 144,211<br />

5B 8,294 9,887 147,221<br />

Table 2.1 Cell areas and volumes at the ENRMF landfill site.<br />

Cell construction comprises:<br />

Leachate drainage layer. This varies between cells, but in Cells 3, 4 and 5 it<br />

will be 500 mm of crushed granite.<br />

Artificial sealing liner. All cells include a 2 mm thick high density<br />

polyethylene (HDPE) geomembrane.<br />

Artificial mineral layer. All cells (except the western extension and Cell 2b)<br />

include at least 1.5m thickness of artificially emplaced geological barrier<br />

(Upper Lias clay sourced from the Slipe Clay Pit). This clay will be placed<br />

with a maximum design permeability of 3x10 -10 m/s and thickness of 1.5m or<br />

equivalent to meet the Environmental Permit requirement for permeability of<br />

less than or equal to 1.0 x l0 -9 m/s with a thickness of more than or equal to<br />

5m.<br />

The geological barrier also includes between 3 and 8 m of natural geological barrier<br />

(unsaturated zone) above the water table.<br />

Waste is examined on receipt at the site and after checking for compliance with the<br />

waste acceptance criteria is deposited within the current filling area. Temporary haul<br />

roads are formed within the fill area ensuring the de1ivery trucks do not traffic,<br />

unnecessarily, on the waste surface.<br />

Galson Sciences Limited 5 14 July 2009<br />

WS010001/ENRMF/CONSAPP<strong>CRF</strong> 555

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!